Multiple Choice
While preparing a detailed estimate
A) dimension should be measured correct to 0.01 m
B) area should be measured correct to 0.01 sqm
C) volume should be measured correct to 0.01 cum
D) all the above
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q9: The expected out turn of cement concrete
Q10: The measurement is not made in square
Q11: Pick up the correct statement from the
Q12: In long and short wall method of
Q13: The concrete work for the following part
Q15: According to ISI method of measurement, the
Q16: Due to change in price level, a
Q17: The expected out turn of 2.5 cm
Q18: The value of 'A' of Indian type
Q19: The cost of the earthwork in excavation