Multiple Choice
The concrete work for the following part of the building of specified thickness is measured in square metres
A) root slabs
B) floors
C) wall panels
D) all the above
Correct Answer:

Verified
Correct Answer:
Verified
Related Questions
Q8: Pick up the correct statement from the
Q9: The expected out turn of cement concrete
Q10: The measurement is not made in square
Q11: Pick up the correct statement from the
Q12: In long and short wall method of
Q14: While preparing a detailed estimate<br>A)dimension should be
Q15: According to ISI method of measurement, the
Q16: Due to change in price level, a
Q17: The expected out turn of 2.5 cm
Q18: The value of 'A' of Indian type