Multiple Choice
Istanbul Industries uses a kanban system to manage production of the MI6 subassembly. In an 8-hour day, they use 100 units per hour and use containers that can hold 23 units each. It takes 120 minutes to fill and move a container of parts to the right place on the MI6 line that is currently rated at a 15% safety factor.
-If the number of containers is reduced by 1, what would be the new demand, all else being constant?
A) 100 units per hour
B) 800 units for an 8-hour day
C) 90 units for an 8-hour day
D) 100 units for an 8-hour day
E) 90 units per hour
Correct Answer:

Verified
Correct Answer:
Verified
Q32: Copenhagen Industries uses a kanban system to
Q33: A lean system uses 12 containers, each
Q34: A lean system uses 12 containers, each
Q35: The Frankenmuth Fasteners Co. was implementing lean
Q36: An integrated electronic-chip manufacturer has a demand
Q38: Lady Bug Machineries uses a lean production
Q39: A lean system has the following characteristics:
Q40: An integrated electronic-chip manufacturer has a demand
Q41: A lean system has the following characteristics:
Q42: Berlin Industries uses a kanban system to