Solved

Assume That All of the Jobs Below Arrived at the Same

Question 69

Multiple Choice

Assume that all of the jobs below arrived at the same time. Also assume that transfer times are zero and jobs cannot be split
Assume that all of the jobs below arrived at the same time. Also assume that transfer times are zero and jobs cannot be split    -Using a Gantt chart and the processing order as per the critical ratio (CR)  rule, determine the average flow time. A) 1.4 hrs B) 6.6 hs C) 11.2 hrs D) 15 hrs E) 18 hrs
-Using a Gantt chart and the processing order as per the critical ratio (CR) rule, determine the average flow time.


A) 1.4 hrs
B) 6.6 hs
C) 11.2 hrs
D) 15 hrs
E) 18 hrs

Correct Answer:

verifed

Verified

Unlock this answer now
Get Access to more Verified Answers free of charge

Related Questions