ADAMS Electricals has decided to analyze the job flow of their shop to see if a more effective layout can be designed to reduce average job lead time. They have 6 processing departments in the shop, positioned as shown below. The vertical distance between departments is 30 feet while the horizontal distance is 45 feet. Assume that diagonal moves are not possible.
For a typical day, the number of jobs moving from one department to the next is shown in the matrix below.
-How much total distance is traveled on a given day?
A) 10,830 feet
B) 7,485 feet
C) 3,720 feet
D) 12,510 feet
E) Need more information to answer the question
Correct Answer:

Verified
Correct Answer:
Verified
Q59: Assume a facility is open 8 hours
Q60: Assuming that the customers are ranked in
Q61: The process design team at a contract
Q62: A tier-two supplier needs to produce 300
Q63: Assuming that the customers are ranked
Q65: For the Buehler Bakery, the desired output
Q66: The following is a sketch of process-focused
Q67: The table depicts an assembly line that
Q68: For the Buehler Bakery, the desired output
Q69: Assume that all of the jobs below