Multiple Choice
For the Buehler Bakery, the desired output for a 8 hour workday is 450 units. The discrete tasks required to produce the product have been identified, timed in seconds, and ordered as indicated in the table.
-Process engineers design a line that contains 8 stations. What is the efficiency?
A) 63.28%
B) 70.31%
C) 90.40%
D) 79.10%
E) Need more information to answer the question
Correct Answer:

Verified
Correct Answer:
Verified