Multiple Choice
If actual cost for a period is $47,250 and standard cost for that same period is $44,750, the dollar difference between the two figures can be viewed as:
A) waste
B) potential savings
C) both (a) and (b) are correct
Correct Answer:

Verified
Correct Answer:
Verified