Multiple Choice
In an MRP master production schedule,the planning horizon is often separated into a series of times periods called:
A) pegging.
B) lead times.
C) stacked lead times.
D) time buckets.
E) None of the choices.
Correct Answer:

Verified
Correct Answer:
Verified