Multiple Choice
Based on Alternative Water Supply-Single Project case study, which of the following statements is TRUE?
A) The Alternative Water Supply project completion time was 42 weeks.
B) Sustainability was not an issue in this case study.
C) The design for the intake and transmission main, along with the bid had to be completed in 35 weeks.
D) Engineering design accounts for 50 percent of the total cost for the project designed by Major Design Corporation (MDC) .
Correct Answer:

Verified
Correct Answer:
Verified