Table 7.5
A company makes four products that have the following characteristics: Product A sells for $50 but needs $10 of materials and $15 of labor to produce;Product B sells for $75 but needs $30 of materials and $15 of labor to produce;Product C sells for $100 but needs $50 of materials and $30 of labor to produce;Product D sells for $150 but needs $75 of materials and $40 of labor to produce.The processing requirements for each product on each of the four machines are shown in the table. Work centers W,X,Y,and Z are available for 40 hours per week and have no setup time when switching between products.Market demand for each product is 80 units per week.In the questions that follow,the traditional method refers to maximizing the contribution margin per unit for each product,and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 7.5.Using the traditional method,in what sequence should products be scheduled for production?
A) D,C,B,A
B) D,B,A,C
C) C,D,A,B
D) C,D,B,A
Correct Answer:

Verified
Correct Answer:
Verified
Q40: A(n) _ line is a product line
Q51: The fourth step in Theory of Constraints
Q78: Paced lines require that inventory storage areas
Q133: What are five of the seven key
Q152: Table 7.8<br>King Supply makes four different types
Q154: Consider the process shown that is trying
Q155: The production of a particular product consists
Q158: Table 7.2 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2904/.jpg" alt="Table 7.2
Q159: Describe three ways that line balancing and
Q160: Table 7.2 <img src="https://d2lvgg3v3hfg70.cloudfront.net/TB2904/.jpg" alt="Table 7.2