Multiple Choice
Table 7.8
King Supply makes four different types of plumbing fixtures: W,X,Y and Z.The contribution margins for these products are: $70 for Product W,$60 for Product X,$90 for Product Y and $100 for Product Z.Fixed overhead is estimated at $5,500 per week.The manufacture of each fixture requires four machines,Machines #1,2,3 and 4.Each of the machines is available for 40 hours a week and there is no setup time required when shifting from the production of one product to any other.The processing requirements to make one unit of each product are shown in the table.Weekly product demand for the next planning period has been forecasted as follows: 70 Ws,60 Xs,50 Ys and 30 Zs. In the questions that follow,the traditional method refers to maximizing the contribution margin per unit for each product,and the bottleneck method refers to maximizing the contribution margin per minute at the bottleneck for each product.
-Use the information in Table 7.8.Using the traditional method,what is the optimal product mix?
A) 70 W,60 X,90 Y,100 Z
B) 70 W,50 X,50 Y,30 Z
C) 70 W,60 X,47 Y,30 Z
D) 70 W,47 X,50 Y,30 Z
Correct Answer:

Verified
Correct Answer:
Verified
Q35: A bottleneck process has the lowest capacity
Q40: A(n) _ line is a product line
Q51: The fourth step in Theory of Constraints
Q55: Fun Vehicles, Inc. makes beach buggies on
Q78: Paced lines require that inventory storage areas
Q133: What are five of the seven key
Q147: Table 7.7<br>A company makes four products that
Q154: Consider the process shown that is trying
Q155: The production of a particular product consists
Q156: Table 7.5<br>A company makes four products that