Exam 7: Linear Programming Models: Graphical and Computer Methods
Exam 1: Introduction to Quantitative Analysis71 Questions
Exam 2: Probability Concepts and Applications157 Questions
Exam 3: Decision Analysis128 Questions
Exam 4: Regression Models133 Questions
Exam 5: Forecasting111 Questions
Exam 6: Inventory Control Models123 Questions
Exam 7: Linear Programming Models: Graphical and Computer Methods110 Questions
Exam 8: Linear Programming Applications105 Questions
Exam 9: Transportation,assignment,and Network Models98 Questions
Exam 10: Integer Programming,goal Programming,and Nonlinear Programming98 Questions
Exam 11: Project Management134 Questions
Exam 12: Waiting Lines and Queuing Theory Models145 Questions
Exam 13: Simulation Modeling79 Questions
Exam 14: Markov Analysis86 Questions
Exam 15: Statistical Quality Control98 Questions
Exam 16: Analytic Hierarchy Process53 Questions
Exam 17: Dynamic Programming67 Questions
Exam 18: Decision Theory and the Normal Distribution50 Questions
Exam 19: Game Theory47 Questions
Exam 20: Mathematical Tools: Determinants and Matrices99 Questions
Exam 21: Calculus-Based Optimization24 Questions
Exam 22: Linear Programming: The Simplex Method100 Questions
Exam 23: Transportation, Assignment, and Network Algorithms111 Questions
Select questions type
Solve the following linear programming problem using the corner point method: 

(Essay)
4.7/5
(30)
A company can decide how many additional labor hours to acquire for a given week.Subcontractor workers will only work a maximum of 20 hours a week.The company must produce at least 200 units of product A,300 units of product B,and 400 units of product C.In 1 hour of work,worker 1 can produce 15 units of product A,10 units of product B,and 30 units of product C.Worker 2 can produce 5 units of product A,20 units of product B,and 35 units of product C.Worker 3 can produce 20 units of product A,15 units of product B,and 25 units of product C.Worker 1 demands a salary of $50/hr,worker 2 demands a salary of $40/hr,and worker 3 demands a salary of $45/hr.The company must choose how many hours they should contract with each worker to meet their production requirements and minimize labor cost.
(a)Formulate this as a linear programming problem.
(b)Find the optimal solution.
(Essay)
4.8/5
(43)
The coefficients of the variables in the constraint equations that represent the amount of resources needed to produce one unit of the variable are called
(Multiple Choice)
4.9/5
(37)
Consider the following linear programming problem:
This is a special case of a linear programming problem in which

(Multiple Choice)
4.8/5
(37)
The solution to a linear programming problem must always lie on a constraint.
(True/False)
4.8/5
(39)
Two models of a product - Regular (X)and Deluxe (Y)- are produced by a company.A linear programming model is used to determine the production schedule.The formulation is as follows:
The optimal solution is X = 100,Y = 0. How many units of the regular model would be produced based on this solution?

(Multiple Choice)
4.8/5
(38)
Management resources that need control include machinery usage,labor volume,money spent,time used,warehouse space used,and material usage.
(True/False)
4.9/5
(29)
An objective function is necessary in a maximization problem but is not required in a minimization problem.
(True/False)
4.9/5
(31)
Any time that we have an isoprofit line that is parallel to a constraint,we have the possibility of multiple solutions.
(True/False)
4.9/5
(33)
Sensitivity analysis enables us to look at the effects of changing the coefficients in the objective function,one at a time.
(True/False)
4.9/5
(34)
What is the increase in the objective value if 2 units of additive is added?
(Multiple Choice)
4.7/5
(34)
Solve the following linear programming problem using the corner point method: 

(Essay)
4.7/5
(35)
Which of the following is not acceptable as a constraint in a linear programming problem (minimization)? 

(Multiple Choice)
4.9/5
(41)
Consider the following linear programming problem:
The maximum possible value for the objective function is

(Multiple Choice)
5.0/5
(37)
The addition of a redundant constraint lowers the isoprofit line.
(True/False)
5.0/5
(43)
In a maximization problem,when one or more of the solution variables and the profit can be made infinitely large without violating any constraints,the linear program has
(Multiple Choice)
4.7/5
(36)
A widely used mathematical programming technique designed to help managers and decision making relative to resource allocation is called
(Multiple Choice)
4.7/5
(36)
A furniture company is producing two types of furniture.Product A requires 8 board feet of wood and 2 lbs of wicker.Product B requires 6 board feet of wood and 6 lbs of wicker.There are 2000 board feet of wood available for product and 1000 lbs of wicker.Product A earns a profit margin of $30 a unit and Product B earns a profit margin of $40 a unit.Formulate the problem as a linear program.
(Essay)
4.8/5
(42)
Showing 21 - 40 of 110
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)