Exam 5: Scheduling the Project

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The difference between EST and LFT is called slack.

Free
(True/False)
4.8/5
(28)
Correct Answer:
Verified

False

The simulation approach is generally preferred over the statistical method.

Free
(True/False)
4.9/5
(42)
Correct Answer:
Verified

True

It is easiest to see lead and lag time in a project task on a PERT/CPM networks.

Free
(True/False)
5.0/5
(36)
Correct Answer:
Verified

False

Milestones are not depended upon the predecessor activities in the project plan.

(True/False)
4.8/5
(45)

"Merger" is a term used to describe the situation in which two or more paths in a network join together.

(True/False)
4.8/5
(28)

What is the expected time to complete a task with an optimistic, most likely, and pessimistic times of 3, 4, and 7 days respectively?

(Multiple Choice)
4.8/5
(29)

What is a merger and what problems do mergers create?

(Essay)
4.8/5
(37)

Technical dependencies are generally easier to see on a Gantt chart than on PERT/CPM networks.

(True/False)
4.9/5
(36)

The difference between LST and LFT is called slack.

(True/False)
4.7/5
(38)

A big advantage of AON networks is that they are easier to draw.

(True/False)
4.9/5
(34)

Nessage Mique, a niche fashion boutique, displays its production process by using a network of nodes and arrows. The nodes are used to depict the state of completion of various activities and the arrows are used to depict their order of precedence. Which of the following project networks is Nessage Mique using in the given scenario?

(Multiple Choice)
4.9/5
(27)

Minkset Blu, a textile company, wants to improve its sales over a span of four years. In the first year, the company installs new looming machines that improve the production cost. However, it takes two years for the company to establish a liaison with online retailers to improve the accessibility of its products. This delays the company's goal of improving sales by a year. In the context of the language of the Program Evaluation and Review Technique (PERT) and the Critical Path Method (CPM), the set of activities that cause the delay are part of _____.

(Multiple Choice)
5.0/5
(27)

Standard Pert/CPM networks can be use to resolve probabilistic concerns.

(True/False)
4.8/5
(41)

The difference between the LST and EST is called slack.

(True/False)
4.8/5
(28)

The tasks of project planning, project budgeting, and project scheduling are largely separable from one another.

(True/False)
4.8/5
(34)

Critical path tasks always have zero slack.

(True/False)
4.9/5
(35)

Slack is calculated as?

(Multiple Choice)
4.9/5
(34)

The start-to-finish linkage is used in situations where is it desirable for two or more activities to finish at the same time.

(True/False)
4.7/5
(36)

A disadvantage of Gantt charts is that they are hard to draw.

(True/False)
5.0/5
(39)

A project schedule is a project action plan converted into a timetable.

(True/False)
4.8/5
(35)
Showing 1 - 20 of 67