Exam 13: Resource Planning
Exam 1: Creating Customer Value128 Questions
Exam 2: Supply Chain Management170 Questions
Exam 3: Supply Chain Sustainability and Humanitarian Logistics132 Questions
Exam 4: Process Configuration132 Questions
Exam 5: Capacity143 Questions
Exam 6: Waiting Lines165 Questions
Exam 7: Inventory Management218 Questions
Exam 8: Quality and Process Improvement153 Questions
Exam 9: Lean Systems112 Questions
Exam 10: Location and Layout216 Questions
Exam 11: Managing Demand and Forecasting189 Questions
Exam 12: Operations Planning and Scheduling134 Questions
Exam 13: Resource Planning174 Questions
Select questions type
The _________ rule is a special case of the periodic order quantity (POQ) rule where the lot size ordered covers the gross requirements of a single time period (e.g. one week).
(Short Answer)
4.9/5
(32)
Management wishes to use a POQ lot- sizing rule for an item that experiences an average demand of 30 units per week. If the desired average lot size is 120 units, what should P be?
(Multiple Choice)
4.9/5
(38)
Faster response to market changes and reduced inventory levels are both benefits of MRP.
(True/False)
4.9/5
(37)
Lot- for- lot (L4L) is a rule that maintains the same order quantity each time an order is issued.
(True/False)
4.9/5
(42)
_________ is an inventory control and scheduling technique that applies MRP principles to distribution inventories.
(Short Answer)
4.9/5
(44)
Explain the major difference for resource planning in service firms compared to manufacturers.
(Essay)
4.8/5
(36)
Which one of the following is a feature of MRP II, but not available in basic MRP systems?
(Multiple Choice)
4.8/5
(39)
Table 13.3
Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s).
Master Production Schedule: the following table shows the MPS start quantities.
Week
Week 1 2 3 4 5 6 A 50 80 100 B 60 100
Bill of Material
-End item A uses 1 each of component C and 1 each of subassembly D.
-Subassembly D uses 2 each of component E and 2 each of component F.
-End item B uses 1 each of component C and 2 each of component F.
Selected Inventory Data
Item
Data Category Lot-sizing rule 4 4 FOQ =250 POQ (=2) Lead time (wks) 3 1 3 1 Beginning (on-hand) inventory 50 80 90 30 Scheduled receipts 80(1) None 250(3) 205(1)
-Use the information in Table 13.3. Which one of the following statements about item C is TRUE?
(Multiple Choice)
4.8/5
(31)
_________ ties the basic MRP system to the company's financial system.
(Short Answer)
4.8/5
(40)
Which one of the following systems is an input to the MRP system?
(Multiple Choice)
4.8/5
(37)
The _________ is a part of the material requirements plans that details how many end items will be produced within specified periods of time.
(Short Answer)
4.8/5
(36)
In an MRP system, a(n) _________ item has at least one parent and at least one component.
(Short Answer)
4.9/5
(34)
_________ is a computerized information system developed specifically to aid in managing dependent demand inventory and scheduling replenishment orders.
(Short Answer)
4.9/5
(36)
A bill of materials lists all components, ingredients, as and materials needed to produce one unit of an end item.
(True/False)
4.8/5
(38)
Explain why MRP does a better job of estimating the need to replenish inventory items than does the fixed order quantity system in a dependent demand environment.
(Essay)
4.7/5
(33)
The underlying logic for level- by- level processing in an MRP system is
(Multiple Choice)
4.8/5
(44)
Part commonality refers to a degree to which a component has more than one immediate parent.
(True/False)
4.7/5
(37)
Safety stock is more complex for independent demand items than for dependent demand items.
(True/False)
4.8/5
(41)