A(n) _________ process that takes sales and operations plans; processes information in the way of time standards, routings, and other information on how the firm produces its services or products; and then plans the input requirements.

(Short Answer)
4.8/5
(37)

A periodic order quantity issues orders at predetermined intervals using the same quantity for each order.

(True/False)
4.7/5
(38)

Complete the following MRP schedule: Complete the following MRP schedule:

(Essay)
4.9/5
(42)

_________ allow an organization to view its operations as a whole rather than having to try to put together the different information pieces produced by its various functions and divisions.

(Short Answer)
4.7/5
(44)

Explain the key differences between the FOQ, POQ and L4L lot sizing rules.

(Essay)
4.9/5
(32)

The purpose of Finite Capacity Scheduling is to

(Multiple Choice)
4.9/5
(28)

Complete the following MRP schedule: Complete the following MRP schedule:

(Essay)
4.8/5
(47)

One of the three types of MRP action notices possible is releasing a new order. Which one of the following statements is TRUE about releasing a new order?

(Multiple Choice)
4.7/5
(37)

Use the following MRP record to answer the question. Use the following MRP record to answer the question.     How large is the second planned order release? How large is the second planned order release?

(Multiple Choice)
4.9/5
(37)

Table 13.7 Table 13.7    -Use the information from Table 13.7. If a FOQ of 75 units is used, how many planned order releases are there for item XYZ? -Use the information from Table 13.7. If a FOQ of 75 units is used, how many planned order releases are there for item XYZ?

(Multiple Choice)
4.9/5
(34)

Use the following MRP record to answer the question. Use the following MRP record to answer the question.    What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1, 2, 3, 4, 5, and 6)? What are the quantities of planned order releases for item XYZ for the first six weeks (weeks 1, 2, 3, 4, 5, and 6)?

(Multiple Choice)
4.7/5
(38)

One of the differences between Enterprise Resource Planning (ERP) and MRPII is that

(Multiple Choice)
4.9/5
(33)

Table 13.2. Table 13.2.    -Use the information in Table 13.2. If the lot sizing was POQ (P = 3) instead of L4L, how many planned order releases would there be? -Use the information in Table 13.2. If the lot sizing was POQ (P = 3) instead of L4L, how many planned order releases would there be?

(Multiple Choice)
4.9/5
(42)

A technique for projecting time- phased requirements for critical workstations is a definition of

(Multiple Choice)
4.9/5
(48)

An item is called a dependent demand item because demand is dependent on customer preferences.

(True/False)
4.8/5
(34)

Use the following MRP record to answer the question. Use the following MRP record to answer the question.   Which one of the following statements about item QRS is TRUE? Which one of the following statements about item QRS is TRUE?

(Multiple Choice)
4.9/5
(35)

Discuss planning lead time for inventory and manufacturers.

(Essay)
5.0/5
(43)

Consider the MPS, BOM, and inventory data shown below. Master Production Schedule: the following table shows the MPS start quantities.  Consider the MPS, BOM, and inventory data shown below. Master Production Schedule: the following table shows the MPS start quantities.   Bill of Material: - Item A uses 2 each of component D, 1 each of component C and 2 each of subassembly B. - Subassembly B uses 2 each of component E.  Selected Inventory Data:  \begin{array} { | c | l | c | c | c | }  \hline \text { Item } & \begin{array} { c }  \text { Lot Size } \\ \text { Technique } \end{array} & \text { Lead Time } & \begin{array} { c }  \text { Scheduled } \\ \text { Receipts } \end{array} & \text { On- Hand } \\ \hline \mathrm { B } & \mathrm { L } 4 \mathrm {~L} & 1 & 40 \text { in period 1 } & \\ \mathrm { C } & \mathrm { POQ } = 3 & 2 & & 40 \\ \mathrm { D } & \mathrm { FOQ } = 250 & 1 & \\ \mathrm { E } & \mathrm { L } 4 \mathrm {~L} & 2 & 160 \text { in period 2 } & \\ \hline \end{array}   Construct the MRP schedule using the above information. Bill of Material: - Item A uses 2 each of component D, 1 each of component C and 2 each of subassembly B. - Subassembly B uses 2 each of component E. Selected Inventory Data: Item Lot Size Technique Lead Time Scheduled Receipts On- Hand 4 1 40 in period 1 =3 2 40 =250 1 4 2 160 in period 2 Construct the MRP schedule using the above information.

(Essay)
4.8/5
(34)

A(n) _________ item is the final product sold to a customer.

(Short Answer)
4.8/5
(34)

Using a periodic order quantity generates a high level of average inventory because it creates inventory remnants.

(True/False)
4.9/5
(42)