Exam 13: Resource Planning
Exam 1: Creating Customer Value128 Questions
Exam 2: Supply Chain Management170 Questions
Exam 3: Supply Chain Sustainability and Humanitarian Logistics132 Questions
Exam 4: Process Configuration132 Questions
Exam 5: Capacity143 Questions
Exam 6: Waiting Lines165 Questions
Exam 7: Inventory Management218 Questions
Exam 8: Quality and Process Improvement153 Questions
Exam 9: Lean Systems112 Questions
Exam 10: Location and Layout216 Questions
Exam 11: Managing Demand and Forecasting189 Questions
Exam 12: Operations Planning and Scheduling134 Questions
Exam 13: Resource Planning174 Questions
Select questions type
In MRP, a(n) _______ is any item manufactured from one or more components.
(Short Answer)
4.8/5
(37)
To match the material requirements plan with a facilities production capacity, the capacity requirements planning technique can be used.
(True/False)
4.9/5
(45)
A term for systems that are large, integrated information systems which support many enterprise processes and data storage needs is called
(Multiple Choice)
4.9/5
(35)
The ability of one piece of software to interact with others is called _________ .
(Short Answer)
4.8/5
(41)
An item made from water more components is referred to as a parent item.
(True/False)
4.9/5
(39)
An action notice is a handwritten memo sent from the supervisor of the department to the line workers.
(True/False)
4.8/5
(31)
The bill of resources (BOR) is a record of all the required material, equipment time, staff, and other resources needed, the parent- component relationships, and the usage quantities.
(True/False)
4.8/5
(39)
Table 13.2.
-Use the information in Table 13.2. How many planned order releases are there for item XYZ?

(Multiple Choice)
4.9/5
(30)
For items manufactured in- house, one component of lead time is waiting time.
(True/False)
4.9/5
(32)
Use the following MRP record to answer the question. Item. ABC Description: Date 1 2 3 4 5 6 7 8 Gross requirements 60 90 150 Scheduled receipts 160 Projected on hand 0 Planned receipts Planned order releases What are the quantity and the week of the first planned order release?
(Multiple Choice)
4.8/5
(34)
MRP is generally practiced on items emanating from independent demand.
(True/False)
4.9/5
(35)
If a planned receipt for an item is due in week 6 and the item's lead time is 2 weeks, in which week will the corresponding planned order release occur?
(Multiple Choice)
4.8/5
(42)
_________ are the total demand derived from all parent production plans.
(Short Answer)
4.9/5
(46)
In MRP, a(n) _________ is an item that may go through one or more operations to be transformed into or become part of one or more parents.
(Short Answer)
4.7/5
(38)
Which one of the following is an MRP lot- sizing rule that attempts to minimize the amount of average inventory?
(Multiple Choice)
4.9/5
(41)
Table 13.3
Consider the following MPS, BOM, and inventory data. You will need a blank MRP record to answer the question(s).
Week
Week 1 2 3 4 5 6 A 50 80 100 B 60 100
Bill of Material
-End item A uses 1 each of component C and 1 each of subassembly D.
-Subassembly D uses 2 each of component E and 2 each of component F.
-End item B uses 1 each of component C and 2 each of component F.
Selected Inventory Data
Item
Data Category Lot-sizing rule 4 4 =250 (=2) Lead time (wks) 3 1 3 1 Beginning (on-hand) inventory 50 80 90 30 Scheduled receipts 80(1) None 250(3) 205(1)
Master Production Schedule: the following table shows the MPS start quantities.
-Use the information in Table 13.3. Which one of the following statements about item E is TRUE?
(Multiple Choice)
4.9/5
(36)
A resource planning process takes sales and operations plans; processes information in the way of time standards, routings, and other information on how the firm produces its services or products; and then plans the input requirements.
(True/False)
4.8/5
(42)
A higher than normal level of equipment failures on the shop floor is likely to be detected from which of the following reports?
(Multiple Choice)
4.9/5
(43)
Use the following MRP record to answer the question.
What will be the projected on- hand inventory quantity in week 8?

(Multiple Choice)
4.8/5
(42)