Exam 14: Products and Processes
Exam 1: Introduction to Materials Management30 Questions
Exam 2: Production Planning System31 Questions
Exam 3: Master Scheduling25 Questions
Exam 4: Material Requirements Planning41 Questions
Exam 5: Capacity Management23 Questions
Exam 6: Production Activity Control35 Questions
Exam 7: Purchasing38 Questions
Exam 8: Forecasting27 Questions
Exam 9: Inventory Fundamentals27 Questions
Exam 10: Order Quantities25 Questions
Exam 11: Independent Demand Ordering Systems40 Questions
Exam 12: Physical Inventory and Warehouse Management31 Questions
Exam 13: Physical Distribution42 Questions
Exam 14: Products and Processes30 Questions
Exam 15: Lean Production27 Questions
Exam 16: Total Quality Management36 Questions
Select questions type
A plant specializing on a limited, concise, manageable set of products, technologies, volumes, and markets is known as a:
Free
(Multiple Choice)
4.8/5
(36)
Correct Answer:
A
Which of the following statements regarding standardization is true?
I. All products made to a given specification will be interchangeable.
II. A range of standard specifications can be established so that the range covers the majority of uses for the item.
III. Standardization results in a larger variety of parts.
Free
(Multiple Choice)
4.9/5
(24)
Correct Answer:
A
During which phase of the product life cycle do profits start to decline?
Free
(Multiple Choice)
4.9/5
(39)
Correct Answer:
C
Which of the following is a characteristic of special-purpose machinery?
(Multiple Choice)
4.7/5
(36)
Which of the following statements is true?
I. Serving similar customers with similar demand characteristics is an example of market focus.
II. A company specializing in assembling cars is an example of process focus.
III. A focused factory specializes in a wide product mix.
(Multiple Choice)
4.8/5
(23)
Which of the following are reasons a firm would buy a product rather than make it in its factory?
(Multiple Choice)
4.7/5
(34)
During which phase of the product life cycle does the unit cost of the product decrease?
(Multiple Choice)
4.8/5
(28)
A graphical representation of the steps and operations in a process is a:
(Multiple Choice)
4.7/5
(36)
Which product design principle permits the practice of postponement?
(Multiple Choice)
4.9/5
(31)
In a particular process, the fixed costs are calculated at $40,000 and the variable costs at $1.50 per unit.
If 10,000 units are to be produced, what is the average cost per unit?
(Multiple Choice)
4.9/5
(29)
Which of the following steps in a continuous improvement study ensures all elements of a job are studied?
(Multiple Choice)
4.8/5
(35)
In designing a process, which of the following needs to be considered?
(Multiple Choice)
4.8/5
(41)
A diagram used to illustrate the main causes and sub-causes leading to a problem or symptom is a:
(Multiple Choice)
4.9/5
(41)
What is the Cost Equalization Point for the two processes shown?
Process A Process B Fixed cost \ 30.00 \ 120.00 Variable cost \ 3.00 \ 2.00
(Multiple Choice)
4.8/5
(35)
The establishment of a common size for electric light sockets is an example of:
(Multiple Choice)
4.9/5
(30)
Showing 1 - 20 of 30
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)