Exam 4: Material Requirements Planning

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements is best?

Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
Verified

E

Which of the following comes directly from external customers?

Free
(Multiple Choice)
4.9/5
(41)
Correct Answer:
Verified

B

In the product structure diagram below item A has _ demand and item D has Demand. In the product structure diagram below item A has _ demand and item D has Demand.

Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
Verified

D

In the diagram below the independent demand item is: In the diagram below the independent demand item is:

(Multiple Choice)
4.9/5
(36)

A set of priority planning techniques for planning component items below the end item level is called:

(Multiple Choice)
4.8/5
(38)

Which of the following represents a major difference between a scheduled receipt and a firm planned order?

(Multiple Choice)
4.9/5
(37)

Which statement is correct?

(Multiple Choice)
4.8/5
(39)

Service parts experience which of the following types of demand?

(Multiple Choice)
4.8/5
(30)

Use the following MRP record and your calculations to answer the following two questions. The component has an order quantity of 100, a safety stock of ten, and a lead time of one period. Complete the following MRP record. Week 1 2 3 4 Gross requirements 25 80 20 80 Scheduled receipts 100 Projected available 30 Net requirements Planned order receipt Planned order release -Complete the above MRP record. Which of the following statements is correct?

(Multiple Choice)
4.9/5
(35)

Use the following MRP record and your calculations to answer the following two questions. The component has an order quantity of 100, a safety stock of ten, and a lead time of one period. Complete the following MRP record. Week 1 2 3 4 Gross requirements 25 80 20 80 Scheduled receipts 100 Projected available 30 Net requirements Planned order receipt Planned order release -The projected available in period four is:

(Multiple Choice)
4.8/5
(34)

Three inputs to the MRP process are:

(Multiple Choice)
4.8/5
(36)

Which of the following statements is best? Which of the following statements is best?

(Multiple Choice)
4.8/5
(40)

Given the following product tree, the parent of B is: Given the following product tree, the parent of B is:    Given the following product tree, the parent of B is:

(Multiple Choice)
4.9/5
(38)

A multi-level bill of material: I. Reflects the way the product will be manufactured. II. Is produced by the purchasing department. III. Is a parts list only and does not contain subassemblies.

(Multiple Choice)
4.9/5
(34)

Which of the following statements is best regarding part numbering systems?

(Multiple Choice)
4.9/5
(41)

Which of the following is NOT true of an MRP record?

(Multiple Choice)
4.8/5
(35)

A bill of material for an item must change:

(Multiple Choice)
4.8/5
(38)

In the following product trees the low level code of item D is: In the following product trees the low level code of item D is:

(Multiple Choice)
4.9/5
(39)

The following two questions use the information in this MRP record. The lead time is 3 weeks. Week 1 2 3 4 5 Gross requirements 60 50 60 70 20 Scheduled receipts 100 Projected available 40 90 30 40 Net requirements Planned order receipt Planned order release 100 -The net requirement for week four is:

(Multiple Choice)
4.8/5
(28)

The ability to relate the demand for an item shown on an MRP record back to the particular parent causing the demand is called:

(Multiple Choice)
5.0/5
(38)
Showing 1 - 20 of 41
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)