Exam 3: Cost Assignment
Exam 1: Introduction to Management Accounting49 Questions
Exam 2: An Introduction to Cost Terms and Concepts64 Questions
Exam 3: Cost Assignment29 Questions
Exam 4: Accounting Entries for a Job Costing System15 Questions
Exam 5: Process Costing29 Questions
Exam 6: Joint and By-Product Costing61 Questions
Exam 7: Income Effects of Alternative Cost Accumulation Systems45 Questions
Exam 8: Cost-Volume-Profit Analysis60 Questions
Exam 9: Measuring Relevant Costs and Revenues for Decision-Making81 Questions
Exam 10: Activity-Based Costing40 Questions
Exam 11: Pricing Decisions and Profitability Analysis59 Questions
Exam 12: Decision-Making Under Conditions of Risk and Uncertainty29 Questions
Exam 13: Capital Investment Decisions: Appraisal Methods77 Questions
Exam 14: Capital Investment Decisions: the Impact of Capital Rationing, Taxation, Inflation and Risk25 Questions
Exam 15: The Budgeting Process86 Questions
Exam 16: Management Control Systems64 Questions
Exam 17: Standard Costing and Variance Analysis 181 Questions
Exam 18: Standard Costing and Variance Analysis 2: Further Aspects12 Questions
Exam 19: Divisional Financial Performance Measures51 Questions
Exam 20: Transfer Pricing in Divisionalized Companies50 Questions
Exam 21: Cost Management95 Questions
Exam 22: Strategic Management Accounting32 Questions
Exam 23: Cost Estimation and Cost Behaviour63 Questions
Exam 24: Quantitative Models for the Planning and Control of Stocks42 Questions
Exam 25: The Application of Linear Programming to Management Accounting30 Questions
Select questions type
Support department costs are accounted for in which one of the following ways?
Free
(Multiple Choice)
4.8/5
(40)
Correct Answer:
B
Staff Company allocates common Building Department costs to producing departments (P1 and P2) based on space occupied, and it allocates common Personnel Department costs based on the number of employees. Space occupancy and employee data are as follows: Building
Personnel
Dept. P1
Dept. P2
Space occupied
2,000 m.
10,000 m.
120,000 m.
70,000 m.
Employees
6
10
80
50
If Staff Company uses the sequential allocation method and the support department with the highest percentage of interdepartmental services is allocated first, the ratio representing the portion of Personnel Department costs allocated to Department P2 is
Free
(Multiple Choice)
4.8/5
(38)
Correct Answer:
C
The optimal level in the trade-off between measurement and error costs is when
Free
(Multiple Choice)
4.9/5
(45)
Correct Answer:
C
Which of the following is a reason to accumulate and separately assign costs by departments?
(Multiple Choice)
4.7/5
(37)
A possible causal factor to use when allocating cafeteria costs would be
(Multiple Choice)
4.9/5
(41)
More accurate product costing information is produced by assigning costs using
(Multiple Choice)
4.7/5
(36)
Examples of producing departments include all of the following EXCEPT
(Multiple Choice)
4.8/5
(38)
Which of the following departments is NOT a support department?
(Multiple Choice)
4.8/5
(42)
Which of the following is a key consideration in selecting an allocation base?
(Multiple Choice)
4.8/5
(35)
Which of the following principles should be applied when the step method of allocating service department costs is used?
(Multiple Choice)
4.8/5
(28)
Explain the key considerations in establishing cost pools and in selecting an allocation base.
(Essay)
4.9/5
(30)
Examples of support departments include all of the following EXCEPT
(Multiple Choice)
4.8/5
(41)
Which of the following allocation methods fully recognizes services that support departments provide to each other?
(Multiple Choice)
4.7/5
(39)
Although adding more activity cost pools to an activity-based costing system may improve the accuracy of product costing, this increase in accuracy must be judged against:
(Multiple Choice)
4.9/5
(39)
An activity-based costing system uses which of the following procedures?
(Multiple Choice)
5.0/5
(45)
The method of accounting for inventory that assigns all manufacturing costs to inventory is sometimes referred to as:
(Multiple Choice)
4.8/5
(34)
When actual overhead cost exceeds overhead applied to production,
(Multiple Choice)
4.9/5
(36)
Which of the following methods of assigning costs is based on convenience or some assumed linkage, and reduces the overall accuracy of the cost assignments?
(Multiple Choice)
4.7/5
(35)
Showing 1 - 20 of 29
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)