Exam 18: Statistical Applications in Quality Management
Exam 1: Defining and Collecting Data202 Questions
Exam 2: Organizing and Visualizing256 Questions
Exam 3: Numerical Descriptive Measures217 Questions
Exam 4: Basic Probability167 Questions
Exam 5: Discrete Probability Distributions165 Questions
Exam 6: The Normal Distribution and Other Continuous Distributions170 Questions
Exam 7: Sampling Distributions165 Questions
Exam 8: Confidence Interval Estimation219 Questions
Exam 9: Fundamentals of Hypothesis Testing: One-Sample Tests194 Questions
Exam 10: Two-Sample Tests240 Questions
Exam 11: Analysis of Variance170 Questions
Exam 12: Chi-Square and Nonparametric188 Questions
Exam 13: Simple Linear Regression243 Questions
Exam 14: Introduction to Multiple394 Questions
Exam 15: Multiple Regression146 Questions
Exam 16: Time-Series Forecasting235 Questions
Exam 17: Getting Ready to Analyze Data386 Questions
Exam 18: Statistical Applications in Quality Management159 Questions
Exam 19: Decision Making126 Questions
Exam 20: Probability and Combinatorics421 Questions
Select questions type
Which of the following best measures the ability of a process to consistently meet specified customer-driven requirement?
(Multiple Choice)
4.8/5
(30)
SCENARIO 18-8
Recently, a university switched to a new type of computer-based registration. The registrar is
concerned with the amount of time students are spending on the computer registering under the new
system. She decides to randomly select 8 students on each of the 12 days of the registration and
determine the time each spends on the computer registering. The range, mean, and standard deviation
of the times required to register are in the table that follows. Range 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22.875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12.875 9.3723
-Referring to Scenario 18-8, an R chart is to be constructed for the time required to register. The
lower control limit for this data set is ________.
(Short Answer)
4.9/5
(30)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, an R chart is to be constructed for the number of blemishes. The
center line of this R chart is located at __________.
(Short Answer)
4.7/5
(45)
SCENARIO 18-9
The manufacturer of canned food constructed control charts and analyzed several quality
characteristics. One characteristic of interest is the weight of the filled cans. The lower specification
limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five
cans tested every fifteen minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 8 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601
-Referring to Scenario 18-9, an R chart is to be constructed for the weight. The upper control
limit for this data set is ________.
(Short Answer)
4.9/5
(32)
One of the morals of the red bead experiment is that variation is part of any
process.
(True/False)
4.9/5
(34)
The SS method establishes ways to organize necessary housekeeping aspects of a
work environment.
(True/False)
4.9/5
(33)
Mistake Proofing devices focus on methods that enable participants to reduce
setup time for equipment and resources and materials needed for changeover.
(True/False)
4.7/5
(31)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, based on the R chart, it appears that the process is out
of control.
(True/False)
4.8/5
(31)
Poke-Yoke devices establish ways to clean and maintain the necessary
housekeeping aspects of a work environment.
(True/False)
4.7/5
(25)
SCENARIO 18-5
A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of
disks with bad sectors was determined for each of these samples. The results are in the table that
follows. 1 9 0.037500 2 7 0.029167 3 4 0.016667 4 6 0.025000 5 8 0.033333 6 3 0.012500 7 6 0.025000 8 10 0.041667 9 16 0.06667 10 24 0.100000 11 15 0.062500 12 9 0.037500 13 4 0.016667 14 8 0.033333 15 6 0.025000
-Referring to Scenario 18-5, a p control chart is to be made for these data. The upper control limit
is __________, and the lower control limit is __________.
(Short Answer)
5.0/5
(38)
SCENARIO 18-10
Below is the number of defective items from a production line over twenty consecutive morning
shifts. Day Nonconformances Day Nonconformances 1 26 11 22 2 27 12 26 3 23 13 21 4 21 14 22 5 26 15 19 6 20 16 17 7 35 17 21 8 30 18 18 9 21 19 16 10 25 20 17
-Referring to Scenario 18-10, construct a c chart for the number of defective items.
(Essay)
4.8/5
(40)
SCENARIO 18-4
A factory supervisor is concerned that the time it takes workers to complete an important production
task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor
proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and
range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be
10 and 30 seconds, respectively.
-Referring to Scenario 18-4, what is the value of the CPL index?
(Short Answer)
4.7/5
(36)
Which of the following is a method for breaking process into a series of steps in order to eliminate defects and produce near perfect results?
(Multiple Choice)
4.8/5
(33)
Total Productive Maintenance focuses on methods that enable participants to
reduce setup time for equipment and resources and materials needed for changeover.
(True/False)
4.8/5
(35)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, construct an chart for the number of blemishes.
(Essay)
4.9/5
(37)
SCENARIO 18-10
Below is the number of defective items from a production line over twenty consecutive morning
shifts. Day Nonconformances Day Nonconformances 1 26 11 22 2 27 12 26 3 23 13 21 4 21 14 22 5 26 15 19 6 20 16 17 7 35 17 21 8 30 18 18 9 21 19 16 10 25 20 17
-Referring to Scenario 18-10, a c chart is to be constructed for the number of defective items.
The lower control limits is ________.
(Short Answer)
4.9/5
(35)
SCENARIO 18-7
A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing
process. She takes samples of size 5 from each day's output and counts the number of blemishes on
each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes.
-Referring to Scenario 18-7, an chart is to be used for the number of blemishes. One way to
obtain the control limits is to take the grand mean and add and subtract the product of A2 times
the mean of the sample ranges. For this data set, the value of A2 is ________.
(Short Answer)
4.9/5
(35)
SCENARIO 18-6
The maker of a packaged candy wants to evaluate the quality of her production process. On each of
16 consecutive days, she samples 600 bags of candy and determines the number in each day's sample
that she considers to be of poor quality. The data that she developed follow. Number Proportion 1 33 0.0550000 2 29 0.0483333 3 31 0.0516667 4 32 0.0533333 5 43 0.0716667 6 45 0.0750000 7 46 0.0766667 8 48 0.0800000 9 48 0.0800000 10 46 0.0766667 11 28 0.0466667 12 32 0.0533333 13 28 0.0466667 14 32 0.0533333 15 31 0.0516667 16 24 0.0400000
-Referring to Scenario 18-6, a p control chart is to be constructed for these data. The estimate of
the standard error of the sample proportion is __________.
(Short Answer)
4.9/5
(38)
The focus of Lean Six Sigma is on removing non-value added steps and waste
which can exist in any part of an organization.
(True/False)
4.7/5
(35)
Showing 81 - 100 of 159
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)