Variation due to the inherent variability in a system of operation is called

(Multiple Choice)
4.8/5
(37)

SCENARIO 18-9 The manufacturer of canned food constructed control charts and analyzed several quality characteristics. One characteristic of interest is the weight of the filled cans. The lower specification limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five cans tested every fifteen minutes during a day's production. Number XBar Range Number XBar Range 1 3.05072 0.0215 16 3.04646 0.073 2 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 18 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 20 3.05078 0.0215 6 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 22 3.05348 0.0581 8 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 10 3.02034 0.0538 25 3.0516 0.0641 11 3.03764 0.0584 26 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 28 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601 -Referring to Scenario 18-9, based on the Xˉ\bar { X } chart, it appears that the process is in control.

(True/False)
4.8/5
(31)

SMED establishes ways to clean and maintain the necessary housekeeping aspects of a work environment.

(True/False)
4.7/5
(29)

SCENARIO 18-2 A political pollster randomly selects a sample of 100 voters each day for 8 successive days and asks how many will vote for the incumbent. The pollster wishes to construct a p chart to see if the percentage favoring the incumbent candidate is too erratic. Sample Number Favoring 1 57 2 57 3 53 4 51 5 55 6 60 7 56 8 59 -Referring to Scenario 18-2, what is the numerical value of the center line for the p chart?

(Multiple Choice)
4.9/5
(40)

SCENARIO 18-10 Below is the number of defective items from a production line over twenty consecutive morning shifts. Day Nonconformances Day Nonconformances 1 26 11 22 2 27 12 26 3 23 13 21 4 21 14 22 5 26 15 19 6 20 16 17 7 35 17 21 8 30 18 18 9 21 19 16 10 25 20 17 -Referring to Scenario 18-10, based on the c chart, no opportunity appears to be present to render an improvement in the process.

(True/False)
4.9/5
(29)

The R chart is a control chart used to monitor a process mean.

(True/False)
4.8/5
(31)

One of the morals of the red bead experiment is:

(Multiple Choice)
4.8/5
(35)

SCENARIO 18-3 A quality control analyst for a light bulb manufacturer is concerned that the time it takes to produce a batch of light bulbs is too erratic. Accordingly, the analyst randomly surveys 10 production periods each day for 14 days and records the sample mean and range for each day. 1 58.5 5.1 2 47.6 7.8 3 64.3 6.1 4 60.6 5.7 5 63.7 6.2 6 57.5 6.0 7 55.0 5.4 8 54.9 6.1 9 55.0 5.9 10 62.7 5.0 11 61.9 7.1 12 60.0 6.5 13 58.3 5.9 14 52.0 5.2 -Referring to Scenario 18-3, suppose the analyst constructs an R chart to see if the variability in production times is in-control. The R chart is characterized by which of the following?

(Multiple Choice)
4.9/5
(36)

SCENARIO 18-8 Recently, a university switched to a new type of computer-based registration. The registrar is concerned with the amount of time students are spending on the computer registering under the new system. She decides to randomly select 8 students on each of the 12 days of the registration and determine the time each spends on the computer registering. The range, mean, and standard deviation of the times required to register are in the table that follows. Range 1 10 5.250 3.4949 2 31 15.250 10.3060 3 13 20.375 4.9262 4 21 22.875 8.3911 5 35 8.500 11.3767 6 18 7.875 6.9372 7 25 11.250 8.5815 8 30 7.875 9.5235 9 17 10.250 6.3640 10 22 9.500 7.8740 11 27 7.875 8.7086 12 26 12.875 9.3723 -Referring to Scenario 18-8, construct an R chart for the time required to register.

(Essay)
4.7/5
(37)

SCENARIO 18-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Scenario 18-4, suppose the supervisor constructs an R chart to see if the variability in collection times is in-control. This R chart is characterized by which of the following?

(Multiple Choice)
4.9/5
(41)

The CPL and CPU indexes are used to measure process' actual performance rather than its potential.

(True/False)
4.9/5
(39)

SCENARIO 18-1 A local newspaper has 10 delivery boys who each deliver the morning paper to 50 customers every day. The owner decides to record the number of papers delivered on time for a 10-day period for one of the delivery boys and construct a p chart to see whether the percentage is too erratic. Number of Papers Number of Papers 1 46 2 45 3 46 4 45 5 43 6 48 7 46 8 49 9 48 10 47 -Referring to Scenario 18-1, which expression best characterizes the p chart?

(Multiple Choice)
4.9/5
(29)

Changes in the system to reduce common cause variation are the responsibility of management.

(True/False)
4.8/5
(30)

SCENARIO 18-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Scenario 18-4, suppose the supervisor constructs an Xˉ\bar { X } chart to see if the process is in-control. What is the center line of the chart?

(Multiple Choice)
4.9/5
(42)

Which of the following situations suggests a process that appears to be operating out of statistical control?

(Multiple Choice)
4.8/5
(38)

SCENARIO 18-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet 1 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 She also decides that the upper specification limit is 10 blemishes. -Referring to Scenario 18-7, an R chart is to be constructed for the number of blemishes. The lower control limit for this data set is ________.

(Short Answer)
5.0/5
(47)

SCENARIO 18-1 A local newspaper has 10 delivery boys who each deliver the morning paper to 50 customers every day. The owner decides to record the number of papers delivered on time for a 10-day period for one of the delivery boys and construct a p chart to see whether the percentage is too erratic. Number of Papers Number of Papers 1 46 2 45 3 46 4 45 5 43 6 48 7 46 8 49 9 48 10 47 -Referring to Scenario 18-1, what is the numerical value of the upper control limit for the p chart?

(Multiple Choice)
4.9/5
(32)

SCENARIO 18-10 Below is the number of defective items from a production line over twenty consecutive morning shifts. Day Nonconformances Day Nonconformances 1 26 11 22 2 27 12 26 3 23 13 21 4 21 14 22 5 26 15 19 6 20 16 17 7 35 17 21 8 30 18 18 9 21 19 16 10 25 20 17 -Referring to Scenario 18-10, based on the c chart, there appears to be a special cause of variation in the process.

(True/False)
4.7/5
(34)

SCENARIO 18-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Scenario 18-4, suppose the supervisor constructs an Xˉ\bar { X } chart to see if the process is in-control. What are the lower and upper control limits of this chart?

(Multiple Choice)
4.9/5
(33)

SCENARIO 18-10 Below is the number of defective items from a production line over twenty consecutive morning shifts. Day Nonconformances Day Nonconformances 1 26 11 22 2 27 12 26 3 23 13 21 4 21 14 22 5 26 15 19 6 20 16 17 7 35 17 21 8 30 18 18 9 21 19 16 10 25 20 17 -Referring to Scenario 18-10, based on the c chart, it appears that the process is out of control.

(True/False)
4.9/5
(38)
Showing 101 - 120 of 159