JIT requires vendors to be located nearby.When compared to synchronous manufacturing this is viewed as an advantage of JIT.

(True/False)
4.8/5
(42)

According to the theory of constraints a bottleneck is any resource whose capacity is greater than the demand placed on it.

(True/False)
4.8/5
(30)

Dr.Eli Goldratt feels that the goal of a firm is to make useful products efficiently.

(True/False)
4.8/5
(42)

The term Dependent Events refers to a process sequence.

(True/False)
4.9/5
(31)

According to the theory of constraints a non-bottleneck is any resource where capacity is less than the demand placed on it.

(True/False)
4.9/5
(37)

According to the theory of constraints, throughput is the rate at which money is generated by the system through sales.

(True/False)
4.8/5
(38)

Which of the following is not an important concept in TOC?

(Multiple Choice)
4.9/5
(31)

The synchronous manufacturing approach uses backward scheduling.

(True/False)
4.8/5
(40)

An MRP system can allow for product rejects by building a larger batch than is demanded, but a JIT system cannot tolerate poor quality.

(True/False)
4.7/5
(33)

According to the theory of constraints which of the following can be a CCR?

(Multiple Choice)
4.9/5
(46)

Buffer inventory in front of a bottleneck is called a time buffer.

(True/False)
4.8/5
(34)

According to the theory of constraints which of the following is a kind of time that makes up the cycle time in production?

(Multiple Choice)
4.8/5
(36)

According to the theory of constraints it is wrong for manufacturers to try to match capacity with demand by attempting to balance capacity across a sequence of processes.Unbalanced capacity is better.

(True/False)
4.8/5
(30)

According to the theory of constraints which of the following is an operational measurement that can be used to measure the firm's ability to make money?

(Multiple Choice)
4.8/5
(38)

The "dollar days" inventory measurement can be used in purchasing to discourage large work-in-process and producing earlier than is needed.

(True/False)
4.8/5
(38)

Which of the following is an approach to dealing with a bottleneck?

(Multiple Choice)
4.9/5
(35)
Showing 41 - 56 of 56