Exam 17: Statistical Applications in Quality Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet Day 1 2 3 4 5 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 -Referring to Table 17-7, an Xˉ\bar { X } chart is to be used for the number of blemishes. The lower control limit for this data set is ________, while the upper control limit is ________.

(Short Answer)
4.7/5
(33)

Which of the following is a method for breaking process into a series of steps in order to eliminate defects and produce near perfect results?

(Multiple Choice)
4.8/5
(32)

Which of the following is not one of Deming's 14 points?

(Multiple Choice)
4.9/5
(33)

TABLE 17-9 The manufacturer of canned food constructed control charts and analyzed several quality characteristics. One characteristic of interest is the weight of the filled cans. The lower specification limit for weight is 2.95 pounds. The table below provides the range and mean of the weights of five cans tested every fifteen minutes during a day's production. Number XBar Rang Number XBar Range 1 3.05072 0.0215 1 3.04646 0.073 3 3.01228 0.087 17 3.03868 0.0696 3 3.03558 0.0851 19 3.03338 0.0329 4 3.01014 0.0674 19 3.03322 0.0455 5 3.00858 0.0983 29 3.05078 0.0215 9 3.02704 0.0527 21 3.04808 0.0396 7 3.04268 0.0508 23 3.05348 0.0581 9 3.01052 0.0791 23 3.05516 0.0682 9 3.03464 0.0663 24 3.03426 0.0325 19 3.02034 0.0538 25 3.0516 0.064 11 3.03764 0.0584 29 3.05562 0.0809 12 3.0409 0.0434 27 3.04402 0.0374 13 3.0519 0.0762 29 3.06458 0.0284 14 3.03994 0.0833 29 3.0544 0.0738 15 3.03788 0.0601 -Referring to Table 17-9, construct an Xˉ\bar { X } chart for the weight.

(Essay)
4.9/5
(31)

TABLE 17-4 A factory supervisor is concerned that the time it takes workers to complete an important production task (measured in seconds) is too erratic and adversely affects expected profits. The supervisor proceeds by randomly sampling 5 individuals per hour for a period of 10 hours. The sample mean and range for each hour are listed below. 1 18.4 25 2 16.9 27 3 23.0 30 4 21.2 23 5 21.0 24 6 24.0 25 7 19.3 12 8 15.8 14 9 20.0 13 10 23.0 11 She also decides that lower and upper specification limit for the critical-to-quality variable should be 10 and 30 seconds, respectively. -Referring to Table 17-4, what percentage of the time it takes workers to complete an important production task will fall inside the specification limits?

(Short Answer)
4.7/5
(36)

Changes in the system to reduce common cause variation are the responsibility of management.

(True/False)
4.8/5
(33)

TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows. 2 7 0.029167 3 4 0.016667 4 6 0.025000 5 8 0.033333 6 3 0.012500 7 6 0.025000 8 10 0.041667 9 16 0.066667 10 24 0.100000 11 15 0.062500 12 9 0.037500 13 4 0.016667 14 8 0.033333 15 6 0.025000 -Referring to Table 17-5, construct a p control chart for these data.

(Essay)
4.9/5
(30)

Variation signaled by individual fluctuations or patterns in the data is called

(Multiple Choice)
4.9/5
(29)

The CPL and CPU indexes are used to measure a process's actual performance rather than its potential.

(True/False)
4.7/5
(22)

TABLE 17-7 A supplier of silicone sheets for producers of computer chips wants to evaluate her manufacturing process. She takes samples of size 5 from each day's output and counts the number of blemishes on each silicone sheet. The results from 20 days of such evaluations are presented below. Sheet Day 1 2 3 4 5 8 10 14 6 5 8.6 9 2 8 13 6 6 10 8.6 7 3 10 12 7 7 9 9.0 5 4 5 9 12 7 10 8.6 7 5 8 3 8 9 10 7.6 7 6 9 7 9 6 9 8.0 3 7 10 10 5 7 6 7.6 5 8 10 9 10 6 5 8.0 5 9 6 10 6 9 9 8.0 4 10 6 9 8 6 8 7.4 3 11 8 5 6 10 10 7.8 5 12 6 4 7 7 12 7.2 8 13 7 5 7 6 9 6.8 4 14 5 8 8 7 6 6.8 3 15 7 12 10 6 10 9.0 6 16 7 11 4 7 8 7.4 7 17 8 4 5 4 7 5.6 4 18 11 4 11 11 10 9.4 7 19 6 10 6 10 10 8.4 4 20 6 12 12 6 8 8.8 6 -Referring to Table 17-7, an Xˉ\bar { X } chart is to be used for the number of blemishes. The center line of this chart is located at ________.

(Short Answer)
4.8/5
(34)

TABLE 17-5 A manufacturer of computer disks took samples of 240 disks on 15 consecutive days. The number of disks with bad sectors was determined for each of these samples. The results are in the table that follows. 2 7 0.029167 3 4 0.016667 4 6 0.025000 5 8 0.033333 6 3 0.012500 7 6 0.025000 8 10 0.041667 9 16 0.066667 10 24 0.100000 11 15 0.062500 12 9 0.037500 13 4 0.016667 14 8 0.033333 15 6 0.025000 -Referring to Table 17-5, a p control chart is to be made for these data. The center line of the control chart is ________.

(Short Answer)
4.9/5
(34)

The p chart is a control chart used for monitoring the proportion of items that meet given specifications.

(True/False)
4.7/5
(35)

Variation due to the inherent variability in a system of operation is called

(Multiple Choice)
4.8/5
(32)
Showing 121 - 133 of 133
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)