Exam 2: The Manager, the Organization, and the Team
Exam 1: The World of Project Management97 Questions
Exam 2: The Manager, the Organization, and the Team93 Questions
Exam 3: Planning the Project85 Questions
Exam 4: Budgeting the Project69 Questions
Exam 5: Scheduling the Project108 Questions
Exam 6: Allocating Resources to the Project89 Questions
Exam 7: Monitoring and Controlling the Project96 Questions
Exam 8: Evaluating and Terminating the Project80 Questions
Select questions type
On a scrum team, developers are responsible for doing the work associated with creating the new product or improving an existing product.
(True/False)
4.8/5
(39)
If the performance of all subsystems is optimized, it follows that the overall system is optimum.
(True/False)
4.9/5
(37)
The project manager must maintain a high level of flexibility in dealing with people.
(True/False)
4.9/5
(36)
Samuel is a project manager who is working on his first project. He assembles a multidisciplinary team and assigns roles and responsibilities to each team member. In this scenario, Samuel is in the _____ phase of team development.
(Multiple Choice)
4.9/5
(28)
Responsible for translating these desires into product requirements and developing the overarching strategy for the project.
(Multiple Choice)
4.9/5
(42)
PM3 is a maturity measure developed by R. Remy (1997). An organization has these characteristics: disorganized, accidental successes and failures. What level is it?
(Multiple Choice)
4.7/5
(30)
PM3 is a maturity measure developed by R. Remy (1997). An organization has these characteristics: standardized processes, more predictable results. What level is it?
(Multiple Choice)
4.9/5
(44)
In order for a project manager to be "believable", the PM must have technical and administrative credibility.
(True/False)
4.9/5
(30)
Altering the specifications of an ongoing project is referred to as…
(Multiple Choice)
4.9/5
(42)
It is appropriate for the project manager to play an active role in communications between the client and the senior management of the organization conducting the project.
(True/False)
4.8/5
(30)
The individual with responsibility for performing a task is more likely to overestimate the time required to complete the task than is their immediate supervisor.
(True/False)
4.9/5
(31)
An advantage of pure project organization is its great depth of technical knowledge.
(True/False)
4.9/5
(40)
PM3 is a maturity measure developed by R. Remy (1997). An organization has these characteristics: controlled and measured processes, results more in line with plans. What level is it?
(Multiple Choice)
4.8/5
(41)
Martha has taken on an ambitious project that requires input from different departments within the organization she works at. She also needs contributions from external experts and contractors. She needs to bring the work of all these groups together in a harmonious whole for the project. In the given scenario, Martha needs to engage in _____.
(Multiple Choice)
4.7/5
(34)
The most effective program managers tell their project managers exactly what to do. The project manager should not allow functional managers to usurp his or her control of the project.
(True/False)
4.8/5
(29)
It is common to have more than one boss in a matrix organization.
(True/False)
4.7/5
(37)
The functional manager has expertise in the function he or she manages, but the project manager rarely has expertise in many of the projects technical areas.
(True/False)
4.8/5
(37)
During project formation stage, the major sources of conflict are all of the following except:
(Multiple Choice)
4.7/5
(48)
Showing 61 - 80 of 93
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)