Exam 2: HPE Storage Solutions

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

A customer needs to analyze performance and capacity of their storage environment. Their environment consists of HPE 3PAR, EMC VNX, and Pure Systems. Which tool should you use to begin your assessment of their environment?

(Multiple Choice)
4.8/5
(45)

Is this a correct statement about discounts for HPE GreenLake solutions? Solution: For large and highly competitive deals, the HPE GreenLake solution can use escalated pricing following usual processes.

(Multiple Choice)
4.7/5
(38)

A customer is interested in using HPE InfoSight Cross-stack Analytics for VMware. Where does the customer need to make the appropriate configuration changes to makes this active?

(Multiple Choice)
4.9/5
(38)

You are designing a custom HPE GreenLake solution and have created solution BOMs. Is this the next step in the process? Solution: Present your business case to the customer.

(Multiple Choice)
4.9/5
(40)

You completed the HPE Nimble storage replication partnership in a customer environment. When you test the network connection from the primary partner to the secondary partner, the test fails; when you test the connection from the secondary to the primary partner, the test is successful. What is the most likely cause of the failure?

(Multiple Choice)
4.8/5
(35)

Is this information you should gather and provide to HPE to qualify a customer for HPE GreenLake? Solution: How many months it takes from concept to production to provision infrastructure.

(Multiple Choice)
4.9/5
(30)

Your customer is interested in HPE GreenLake solutions, but would like assistance with operating the solution and performing tasks such as monitoring, design, patching, and troubleshooting. You decide the customer is a good prospect for Adaptive Management Services (AMS). Is this something you should explain to the customer? Solution: Support services and required with HPE GreenLake solutions, but HPE does not offer management or operation services.

(Multiple Choice)
4.8/5
(38)

You want to use FCAP authentication in an environment with FOS 7.3 running switches with no extra licenses. What should you do to use this feature?

(Multiple Choice)
4.9/5
(29)

A customer wants to enable an automated failover for their two existing HPE 3PAR solutions, which are located in two different sites. Each solution has an All-inclusive Single-System Software license. Which component is required to enable this function?

(Multiple Choice)
4.7/5
(43)

An HPE partner is creating an HPE GreenLake SOW for the customer to sign. Does this correctly describe the SOW pass-thru terms? Solution: Partners can negotiate these terms with HPE.

(Multiple Choice)
4.8/5
(37)

Is an HPE partner responsible for completing this task in the HPE GreenLake sales process? Solution: Ensure customer agreement to a multi-year term of at least three years for the HPE GreenLake services.

(Multiple Choice)
4.8/5
(39)

Is this a step in the Change Order Process? Solution: The HPE partner sends the List Price BOM developed in Excel and UCID to the HPE Pointnext Services Deal Owner and HPE GreenLake Project Manager.

(Multiple Choice)
4.8/5
(38)

You are working with a customer who is considering solution offerings from different vendors. Is this an appropriate statement to differentiate HPE GreenLake from a consumption model offering from another vendor? Solution: HPE GreenLake offers increased cost savings when compared to dollar amount per unit.

(Multiple Choice)
5.0/5
(38)

A customer has HPE B-series switches and is not interested in Extended Fabric licenses for edge switches. They have sites over 10km apart. Which SAN extension technology should you recommend?

(Multiple Choice)
4.9/5
(45)

You are designing a custom HPE GreenLake solution and have created solution BOMs. Is this the next step in the process? Solution: Submit the BOMs and other supporting material to the assigned HPE Deal Owner.

(Multiple Choice)
4.9/5
(46)

Does this correctly describe service components of a custom HPE GreenLake solution? Solution: The solution includes installation services.

(Multiple Choice)
4.8/5
(36)

Which advantage is provided by HPE 3PAR Remote Copy across all replication modes?

(Multiple Choice)
4.9/5
(31)

A customer needs to upgrade their existing HPE 3PAR environment. They ask you to present a solution to gather data from all 200 of their HPE 3PARs arrays, which are spread across the globe. The arrays consist of various generations and OS levels, and they are managed by regional instances of SSMC. What should you present to the customer as a solution?

(Multiple Choice)
4.8/5
(34)

A customer has two HPE Nimble arrays that are replication partners. The replication schedule is set to every hour. After replication completed at 1:00pm, the array at the primary site suffers a power failure. Applications were failed over successfully by the administrators, and production continued on the secondary site array as designed. At 3:00pm, the power was restored to the primary site array. What does the administrator need to do first to restore services in the primary site?

(Multiple Choice)
4.9/5
(31)

A customer purchased a custom HPE GreenLake solution last year. The customer tells you the company is starting a new pilot project and is concerned about running out of capacity. Current utilization peaks at around 88 percent, but is usually lower. Is this part of the process that you should complete to meet the customer's changing needs? Solution: Create a new Start BOM and End BOM for a new custom solution based on the new customer requirements.

(Multiple Choice)
4.8/5
(35)
Showing 21 - 40 of 94
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)