Exam 3: Configuring HPE GreenLake Solutions
Exam 1: Designing Multi-Site HPE Storage Solutions148 Questions
Exam 2: HPE Storage Solutions94 Questions
Exam 3: Configuring HPE GreenLake Solutions95 Questions
Exam 4: Architecting Advanced HPE Server Solutions92 Questions
Exam 5: Designing HPE Server Solutions83 Questions
Exam 6: Delta - Designing HPE Server Solutions123 Questions
Exam 7: Designing HPE Hybrid IT Solutions80 Questions
Exam 8: Implementing HPE Composable Infrastructure Solutions25 Questions
Exam 9: Designing HPE Software-Defined Infrastructure Solutions43 Questions
Exam 10: Building HPE Hybrid IT Solutions71 Questions
Exam 11: Designing HPE Nimble Solutions78 Questions
Exam 12: Using HPE OneView54 Questions
Exam 13: Selling Aruba Products and Solutions36 Questions
Exam 14: Designing Aruba Solutions14 Questions
Exam 15: Aruba Certified Design Associate34 Questions
Exam 16: Aruba Certified ClearPass Professional (ACCP) V6.740 Questions
Exam 17: Aruba Certified Mobility Associate Exam72 Questions
Exam 18: Aruba Certified Mobility Professional Exam23 Questions
Exam 19: Aruba Certified Switching Associate98 Questions
Exam 20: Aruba Certified Switching Professional34 Questions
Exam 21: Aruba Certified Mobility Expert Written Exam32 Questions
Exam 22: HPE Sales Certified - Aruba Products and Solutions36 Questions
Select questions type
View the Exhibit.
Refer to the exhibit. An architect is planning an HPE Moonshot System with m710 cartridges to support a customer application virtualization solution. The customer indicated that the maximum acceptable response time for the solution is three seconds. The architect has implemented a POC and tested a single cartridge with different numbers of user sessions. The architect monitored resource utilization throughout the tests. The results of the test with the point at which the response time exceeded three seconds are shown, marked as the "VSI max." What should the architect conclude from this test?


Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
C
A customer has a mixed environment based on the G6, G7, Gen8, and Gen9 ProLiant server blades. The customer is interested in implementing HPE OneView but needs to understand security and monitoring mechanisms for different server generations. Which statement most accurately describes different platform support in HPE OneView?
Free
(Multiple Choice)
5.0/5
(42)
Correct Answer:
A
A customer needs a hosted physical desktop solution. Users will run typical o?ice applications with limited use of some media-rich applications such as Adobe Photoshop. The customer needs the densest and most cost-effective solution that can support such users. Which HPE Moonshot cartridge should the architect recommend?
Free
(Multiple Choice)
4.9/5
(46)
Correct Answer:
D
A customer plans to migrate from two fully depreciated high end Relational Database Management System (RDMS) servers, which are out of warranty and still under a support contract. An architect has recommended the customer migrate to four new HPE Superdome X BL920 (2P/18C) blades running Microsoft SQL server. Which cost statement provides a rationale for the migration?
(Multiple Choice)
4.8/5
(32)
A customer is planning to migrate from a Virtual Connect Enterprise Manager (VCEM) environment to HPE OneView. Which topic should the architect discuss with the customer before the migration is implemented?
(Multiple Choice)
4.7/5
(39)
What is a basic assumption for an architect using the HPE Servers TCO calculator to justify a customer's migration away from a fully depreciated set of hardware?
(Multiple Choice)
4.9/5
(40)
An architect proposes an HPE Moonshot 1500 chassis with m710p cartridges, an HPE Moonshot 45XGc Switch, and an HPE 4-QSFP+Uplink Module. The customer informs the architect that each cartridge requires a redundant 10GbE link. How should the architect change the proposal?
(Multiple Choice)
4.8/5
(37)
An architect reviews an HPE Apollo 6000 design and finds that there are plans for redundant iLO connections on each HPE Apollo 6000 chassis to a pair of top-of-rack switches. These switches are set up as individual switches connected to a single core. Which configuration change should the architect recommend to ensure a loop free management topology?
(Multiple Choice)
4.8/5
(37)
A customer plans to use Insight Control server provisioning and HPE OneView for vCenter Server. The vCenter Server manages one c7000 enclosure with 16 server blades running VMware ESXI. Which licensing option should the architect include in the proposal?
(Multiple Choice)
4.8/5
(34)
An architect proposes an HPE Moonshot server solution for a customer. The customer needs a single processor solution with a network switch to allow 10Gb connectivity and support for a software-defined network solution. Which HPE Moonshot switch module meets the customer's needs?
(Multiple Choice)
4.8/5
(35)
A customer has a large Oracle-based ERP solution that runs on HPUX and multiple rx2800 i2 servers. The customer plans to move to an open source solution to reduce operating expenses. The customer needs the ability to deliver incremental capacity and needs to avoid incremental Oracle licensing costs. Which HPE Server solution will help meet the customer's needs?
(Multiple Choice)
4.9/5
(38)
How does the HPE c7000 BladeSystems use of network infrastructure compare with the HPE Apollo 6000's?
(Multiple Choice)
4.8/5
(42)
An architect needs to design a solution for a customer that stores all data on third-party NAS storage, and that does not yet have a database solution. The new HPE-based solution must be optimized for data mining. How can the current data stored on the NAS be used for data mining?
(Multiple Choice)
5.0/5
(39)
An architect is planning an HPE Moonshot System deployment. The architect plans to individually connect each iLO CM module to the management network. The customer informs the architect that this plan requires too many 1GbE ports per rack for the data center infrastructure. What is one way that the architect can alter the plan to meet the customer's needs, while still allowing iLO access to the HPE Moonshot Systems?
(Multiple Choice)
4.9/5
(38)
An architect needs to determine whether a customer is ready to move to a software-defined data center (SDDC). Which additional information should the architect obtain from the customer to verify this?
(Multiple Choice)
4.9/5
(32)
A customer has an HPE Integrity Superdome X solution. The customer requires flexible nPartitions that IT staff can quickly build at different times based on a pre-defined template. Which approach should the architect recommend the customer take to meet this requirement?
(Multiple Choice)
4.8/5
(37)
An architect is designing an HPE Apollo 6000 solution to support an HPC application that is highly parallel and involves a lot of communication between compute nodes. The architect is choosing the FlexibleLOM options for the compute trays. Which technology should the architect ensure that the trays support?
(Multiple Choice)
4.7/5
(43)
A customer is working on a project to enable workplace productivity. The customer needs a solution that will allow employees to connect to their workplace environment by using a personal mobile phone, tablet, laptop, or desktop computer. Employees must be able to stop and resume work seamlessly while travelling between offices. Which purpose-built hardware can the customer use to help achieve this goal?
(Multiple Choice)
4.9/5
(25)
During a data center transformation discussion, an architect obtains the following customer information: core business depends heavily on advanced data modelling techniques that has been developed internally infrastructure in use takes anywhere from 10 hours to five days to complete complex data models for the various development teams that rely on them has a proud reputation as an "environmentally friendly" Fortune 500 company increasing productivity of its development team is the highest priority Which large scale HPC solution should the architect recommend to help the customer achieve its transformation goals?
(Multiple Choice)
4.8/5
(47)
An architect is proposing a solution that has two HPE Moonshot 1500 chassis, each of which is full of m700 cartridges. The customer needs the solution to quickly deploy the OS to cartridges, back up a golden node image. and clone the image. The customer is concerned about cost and is not interested in managing or monitoring performance of the solution, Which solution meets these requirements?