Exam 3: Configuring HPE GreenLake Solutions

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

An architect is planning an HPE Moonshot System to host a customer Hadoop MapReduce2 application. The architect originally proposed the following: m710 cartridges HPE 45XGc switches HPE 4-QSFP+ Uplink Modules The customer now needs each HPE Moonshot chassis to provide at least 1TB of memory and 40TB or local storage. Cartridge nodes needs two 10GbE ports each. What does the architect need to replace in the solution to meet the customer's new requirements?

(Multiple Choice)
4.8/5
(43)

An architect is choosing between 1GbE and 10GbE connectivity for an object storage solution. What is a valid reason to select 10GbE?

(Multiple Choice)
4.9/5
(31)

A customer needs to integrate an existing incident management application with HPE OneView. The customer needs to be notified when the physical resource status changes or when a new server is added to the infrastructure. Which HPE OneView feature should the architect recommend to the customer?

(Multiple Choice)
4.8/5
(41)

An architect takes the following notes during a meeting with a customer: plans to introduce an entirely new service offering to customers servers will be virtualized and will consume large amounts of storage space project is to operate in an isolated section of the data center with limited access to the corporate network need flexibility to grow quickly as required by the new service demands on the infrastructure has no repeatable process for firmware management concerned about how long it will take for the project team to become productive on the new infrastructure Which solution should the architect propose to help the customer overcome all of its project challenges?

(Multiple Choice)
4.8/5
(40)

What is one advantage of hard partitioning, or nPartitioning, for HPE Integrity Superdome X as compared to virtual partitioning?

(Multiple Choice)
4.8/5
(36)

A customer plans a partial migration from VMware to Red Hat Enterprise Virtualization (RHEV). The customer plans to purchase a new server platform for RHEV implementation with Gen9 server blades and Virtual Connect FlexFabric modules. Which additional product should the architect include in the proposal?

(Multiple Choice)
4.9/5
(41)

An architect is determining the amount of memory to propose for an HPE XL230a compute tray. The customer specifies several requirements, properties, and parameter of the application. Which factor will critically affect the memory amount requirement to prevent a potential memory bottleneck?

(Multiple Choice)
4.8/5
(48)

A customer has a Hadoop big data and analytics solution. The customer needs a server upgrade to improve performance for this solution and plans to add more solutions that draw on the data, such as a Cassandra NoSQL database. The customer is interested in a flexible HPE Big Data Reference Architecture approach. Which solution meets the customer's needs?

(Multiple Choice)
4.9/5
(35)

A customer has HPE BladeSystem BL460c Gen9 blades with two processors and 512GB of memory. The blades are running a MS-SQL database on a clustered 2TB SAS virtual volume that is exported from an HPE 3PAR StoreServ 8200. The customer reports that the MS-SQL database is performing poorly. After extensive performance trending analysis, it is determined that the database front-end I/O requirements are unpredictable and often exceed 100,000 IOPs with latency in excess 30ms at critical times. Which solution should the architect recommend to resolve the performance issue with consideration to cost and complexity?

(Multiple Choice)
4.8/5
(35)

A customer's business critical application server, which is managed by HPE OneView, recovered from an automatic ASR reboot. HPE Support requests an Active Health System log. What should the customer use to access the log while the server is online?

(Multiple Choice)
4.8/5
(42)

An architect plans to propose a solution and illustrate how it will reduce the predictable and repeatable costs for items and services not registered as assets. Which reporting period information helps the architect achieve this goal?

(Multiple Choice)
4.9/5
(26)

An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO Chassis Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over a Remote console. What should the architect explain to the customer?

(Multiple Choice)
4.8/5
(41)

Under which Transformation Area do HPE Moonshot solutions with Citrix fail?

(Multiple Choice)
4.7/5
(37)

An architect is writing a response to a Request for Proposal (RFP). The customer has requested financial information on the monetary amount by which assets are valued in business records. Which value does the architect need to consider?

(Multiple Choice)
4.9/5
(36)

Which statement describes the availability metrics for an HPE system's high availability?

(Multiple Choice)
4.8/5
(40)

A cost-conscious customer needs a server upgrade to host a Citrix application virtualization solution. The solution must meet the following requirements: - Support 1,200 simultaneous users - Scale out easily to accommodate 20 percent future growth - Provide optimum performance for applications such as Microsoft Office Suite, Skype for Business, and Adobe Photoshop Which solution should the architect recommend?

(Multiple Choice)
4.9/5
(40)

A customer operates a data center based on third-party servers, which includes third-party storage with an iSCSI SAN. The architect needs to design a solution that can seamlessly access the current data from a new HPE Moonshot system. How can the HPE Moonshot system access the legacy storage?

(Multiple Choice)
4.8/5
(41)

A customer's Gen9 web server resides behind a firewall. What is the most secure and efficient method to monitor this server?

(Multiple Choice)
4.8/5
(33)

Which discussion point describes a Tier I approach to datacenter redundancy levels?

(Multiple Choice)
5.0/5
(33)

  An architect proposes an HPE Moonshot solution to a customer. The customer informs the architect that the data center switches can only provide four 40GbE ports per rack. How should the architect modify the proposed solution so that each rack meets the requirement? An architect proposes an HPE Moonshot solution to a customer. The customer informs the architect that the data center switches can only provide four 40GbE ports per rack. How should the architect modify the proposed solution so that each rack meets the requirement?

(Multiple Choice)
5.0/5
(38)
Showing 61 - 80 of 95
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)