Exam 3: Configuring HPE GreenLake Solutions

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

HPE Moonshot 180G Switch Modules and HPE Moonshot 16-SFP+ Uplink ModulesA customer is planning to replace its DAS-based third-party server solution with an HPE BladeSystem solution using FlexFabric connected to an iSCSI based HPE StoreVirtual 3200. Which method should the architect recommend for migrating data from the old system to the new system?

(Multiple Choice)
4.7/5
(35)

A customer recently purchased an HPE Moonshot chassis to host its internal website. Subsequently, the customer reports difficulties deploying new cartridges in an efficient manner. The customer suggests exchanging the solution for a more traditional server platform. What can the architect demonstrate to the customer to help solve the problem while preserving the validity of the original design solution?

(Multiple Choice)
4.8/5
(30)

An architect is planning an HPE Integrity Superdome X solution. One nPartition will include two HPE BL920s Gen9 blades. After discussions and testing, the architect determines that the nPartition requires more memory than initially planned. Which approach should the architect recommend to the customer to ensure optimum performance?

(Multiple Choice)
4.8/5
(29)

A customer is considering upgrading from a BL460c Gen8 to a BL460c Gen9 server. The customer needs to retain the ESXI V5.5 boot volumes and enable UEFI secure boot mode on the new BL460c Gen 9 server. What should the architect explain to the customer?

(Multiple Choice)
4.9/5
(45)

A proposed solution includes the HPE Moonshot-4QSFP+ Uplink Modules. The customer informs the architect that the planned purchase of 40GbE switches has been postponed. The customer still intends to purchase 40GbE switches within a year, but in the meantime, existing 10GbE switches will be used. These switches are HPE network switches located 25 meters from the location of the racks that house the HPE Moonshot Solution. The customer needs 30Gb/s bandwidth. Which action should the architect recommend to allow the customer to deploy the solution immediately and easily take advantage of 40GbE when deployed later?

(Multiple Choice)
4.8/5
(39)

A customer has an HPE c7000 chassis with the following components installed: - Cisco Fabric Extender - Fibre channel pass-through modules - BL460c Gen9 blades with LPe1605 The architect needs to allow network bandwidth control for some of the customer's critical servers and server-to-server communication for vMotion. Which modification should the architect recommend?

(Multiple Choice)
4.8/5
(26)

Which statement describes the availability metrics for an HPE system's high availability?

(Multiple Choice)
4.8/5
(33)

An architect is designing an HPE Apollo 6000 solution to support a customer application. The architect is choosing between the HPE ProLiant XL230a and the XL250a compute tray. What is one reason for choosing the XL250a tray?

(Multiple Choice)
4.9/5
(37)

A customer needs a mission critical SQL database. The customer has an HPE StoreServ and plans to use this as storage. The solution must meet the following requirements: - 240 logical cores (Hyper-Threading enabled) - support for 6TB Memory - 16GB FC - 35TB RAID 1 storage - the ability for hardware partitioning to build different physical partitions and scale as the need for CPU and memory resources grows Which solution should the architect recommend?

(Multiple Choice)
4.7/5
(48)

A customer needs high performance computing (HPC) and a small-scale solution with up to eight processors. The solution should also provide storage in a modular form factor. The customer's HPC application is designed so that some nodes act as compute nodes while others act as storage nodes that serve data to the compute nodes. Which HPE Apollo system is most appropriate for this situation?

(Multiple Choice)
4.8/5
(35)

An architect is proposing an HPE Moonshot System, including m710 cartridges, an iLO Chassis Manager, switch, and uplink modules. The customer needs IT staff to be able to access cartridges over a Remote console. What should the architect explain to the customer?

(Multiple Choice)
4.8/5
(38)

A customer is considering an object storage solution that will provide optimal rack density and will distribute the data with a very resilience across multiple servers and multiple sites. Which type of storage architecture should the architect design to provide the most cost-effective solution?

(Multiple Choice)
4.8/5
(37)

A customer needs to streamline monitoring to its HPE Apollo 6000 solution. Which benefit can HPE Advanced Power Management (APM) provide to this customer?

(Multiple Choice)
4.9/5
(30)

A customer needs a server infrastructure update for its Hadoop HBase solution. The HBase maximum dataset size will be 120TB. To host HBase, the architect is planning three HPE Moonshot 1500 chassis that are fully populated with cartridges. The populated chassis provide the following in total: 135 processors with 4 2.9GHz cares each 4. 32TB RAM 64.8TB local storage on SSDs Which aspect or the design is under provisioned and is likely to cause performance to be degraded to one-tenth or even one-hundredth of its potential?

(Multiple Choice)
4.8/5
(40)

A software development customer's data center has servers from three different vendors. The customer plans to purchase 15 HPE c7000 enclosures that are populated with BL460c Gen9 blades. Each enclosure will be deployed with HPE OneView advanced licensing. The customer uses third-party SNMP-based management tools as well as some custom dashboards that were written to monitor the statue of the datacenter. The infrastructure management team is concerned about how to integrate HPE OneView into its management strategy. What should the architect demonstrate?

(Multiple Choice)
4.9/5
(32)

An architect needs to demonstrate the financial advantages of a proposed HPE server and Hypervisor-based solution compared to a legacy server environment that has traditional servers and desktops. Which tool should the architect use?

(Multiple Choice)
4.7/5
(33)

A customer plans to develop scripts that use the REST API for HPE OneView. However, the customer is concerned about the complexity of the scripts. Which tool can be used to adopt the HPE OneView REST API quicker?

(Multiple Choice)
4.8/5
(37)

A customer purchases a hyperscale solution based on the HPE Moonshot platform and needs a management tool is suitable for this environment and meets the customer's needs?

(Multiple Choice)
4.8/5
(44)

A customer requires a server infrastructure update for its Hadoop HBase solution. The HBase maximum dataset size will be 120TB. To host HBase, the architect is planning three HPE Moonshot 1500 chassis fully populated with cartridges. The populated chassis provide the following in total: - 135 processors with four 2.9GHz cores each - 4.23TB RAM - 64.8TB local storage on SSDs An aspect of the design is under provisioned and is likely to cause performance to degrade to one-tenth or even one-hundredth of its potential. How can the architect resolve this problem?

(Multiple Choice)
4.9/5
(38)

An architect proposes an HPE Moonshot solution with three HPE Moonshot 1500 Chassis as follows: - one chassis with 30 m710 cartridges - two chassis with 30 m800 cartridges each The customer wants to change the solution to use two HPE Moonshot 1500 chassis as follows: - one chassis with 30 m710 cartridges and 15 m800 cartridges - one chassis with 45 m800 cartridges What should the architect explain to the customer?

(Multiple Choice)
4.8/5
(31)
Showing 21 - 40 of 95
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)