A printer has been rated by the manufacturer to print 40 pages per minute (ppm).However it is noticed that the printer has a 5% jamming rate,and also on average 20% of the time is lost on account of the operator loading the paper,aligning the print cartridge,etc.Thus,effectively the printer can print 30.4 pages per minute (ppm).This is the ________ capacity of the printer.

(Short Answer)
4.9/5
(38)

Using mechanisms such as pricing to level demand is called ________.

(Short Answer)
4.8/5
(41)

The capacity strategy where capacity is added in anticipation of demand is called

(Multiple Choice)
4.8/5
(41)

Given the following information,develop a material requirements plan that will yield 400 units of product P at the start of week 7.Item B can only be ordered in lot sizes of 450.Other items can be ordered in lot sizes as required. Given the following information,develop a material requirements plan that will yield 400 units of product P at the start of week 7.Item B can only be ordered in lot sizes of 450.Other items can be ordered in lot sizes as required.

(Essay)
4.7/5
(38)

An advantage of the chase SOP strategy is that inventories can be kept relatively low.

(True/False)
4.9/5
(40)

The capacity that a machine or system should realize given optimal operating conditions is known as ________.

(Short Answer)
4.9/5
(30)

The process of calculating requirements for components and subassemblies from the demand for finished products is called ________.

(Short Answer)
4.8/5
(38)

The capacity for a machine or system that is available after accounting for scrap and rework is known as

(Multiple Choice)
4.8/5
(37)

The process of time phasing and calculating requirements for lower level items from parent items is called ________.

(Short Answer)
4.8/5
(34)

Capacity utilization is the ratio of actual output to actual capacity.

(True/False)
4.8/5
(32)

A database that knows when items will be in stock as well as current inventory levels is called ________.

(Short Answer)
4.9/5
(39)

The capacity for a machine or system that is available after accounting for scrap and rework is known as ________.

(Short Answer)
4.8/5
(39)

The ratio of actual output to actual capacity is

(Multiple Choice)
4.9/5
(37)

Given the following information,compute the efficiency of the system. Actual capacity = 50 units per day Design capacity = 100 units per day Actual output = 30 units per day

(Multiple Choice)
4.7/5
(41)

The phenomenon where producing more such that the average cost of production for the item decreases is known as

(Multiple Choice)
4.7/5
(32)

The portion of ERP that disaggregates the sales and operations plan (SOP)to determine when individual products will be produced is known as the ________.

(Short Answer)
4.9/5
(40)

In a lagging capacity strategy,capacity is added in anticipation of demand.

(True/False)
5.0/5
(36)

The element of the MRP record which is the quantity that has already been ordered and will be received at the beginning of the period is called ________.

(Short Answer)
4.8/5
(36)

Which of the following is an input to the SOP process?

(Multiple Choice)
4.9/5
(33)

The ratio of actual output to design capacity is called ________.

(Short Answer)
4.8/5
(34)