Organizational feasibility can be evaluated by conducting a(n) stakeholder analysis.

(True/False)
4.9/5
(39)

Give the formula for the effort in person-months based on the number of lines of code.

(Essay)
4.8/5
(37)

The work plan records and keeps track of all of the tasks that need to be accomplished over the life of the project, listing each task, along with important information about it, such as when it needs to be completed, the person assigned to do the work, and any deliverables that will result.

(True/False)
4.7/5
(35)

When planning a systems project, overly optimistic timetables are the cause of project completion delays.

(True/False)
4.8/5
(41)

When using a function point estimation worksheet, there are 14 factors that impact the complexity of a project. These factors include _____.

(Multiple Choice)
4.8/5
(35)

Revenue estimates for CD Selection's new Internet music business were computed using three different methods. What is the purpose and value of performing so many computations in determining these estimates?

(Essay)
4.8/5
(37)

_____ value can be quantified during the project initiation phase.

(Multiple Choice)
4.8/5
(38)

Technical feasibility focuses on whether the system can be built by examining the risks associated with the application.

(True/False)
4.8/5
(38)

A functional lead manages a group of programmers and technical staff members.

(True/False)
4.9/5
(44)

The formula for net present value (NPV) is the ratio of (Total benefits - Total Costs) to Total Costs.

(True/False)
4.8/5
(31)

Nicole has identified development and operational costs for a soon-to-be built information system. Her findings will be listed under economic feasibility in the analysis report.

(True/False)
4.8/5
(29)

Briefly Describe three types of standards for system development, and provide examples of each.

(Essay)
4.8/5
(39)

Use-case point-based estimation also has a set of factors that are used to adjust the use-case point value. Which one list in the following is Not one of the technical factors:

(Multiple Choice)
4.8/5
(38)

One of the greatest weaknesses of systems consulting firms is that they try to apply estimates and methodologies that they have developed over time and applied to other projects, most of which are very different from the current project.

(True/False)
4.7/5
(34)

The COCOMO model to convert lines of code estimates into person-month estimates was designed by Allen Albrecht of IBM.

(True/False)
4.8/5
(33)

One method of estimating project time is to use industry standard factors for each project phase. With this method, if the planning phase typically takes 15% of total project time, and a particular project requires three months for planning, then the remainder of the project will require _____.

(Multiple Choice)
4.9/5
(39)

Project size is an important consideration in technical feasibility. Larger projects create more risk, both because they are more complicated to manage and because there is a greater chance that some important system requirements will be overlooked or misunderstood.

(True/False)
4.9/5
(39)

Present value calculation takes inflation and time into account.

(True/False)
4.8/5
(26)

CASE tool is a popular graphic depiction of the work plan that lists project tasks along a y-axis, time along an x-axis, and uses shaded boxes to represent tasks.

(True/False)
4.8/5
(44)

Typically, a technical lead is usually assigned to manage a group of analysts.

(True/False)
5.0/5
(44)