Lower CASE tools are used to create integrated diagrams of the system and store information about system components during the analysis phase.

(True/False)
4.7/5
(35)

The evolutionary Work Breakdown Structure approach is very useful when the requirements of the system are not well understood.

(True/False)
4.9/5
(36)

Discuss the options a project manager has if a phase of a project is completed (a) earlier than expected, and (b) later than expected.

(Essay)
4.9/5
(38)

The critical path in a network diagram is the shortest path from the project inception to completion.

(True/False)
4.7/5
(38)

Determining whether the new system will be compatible with the existing technology that already exists in the organization is part of the organizational feasibility study.

(True/False)
4.9/5
(40)

Most system requests include all of the following except _____.

(Multiple Choice)
4.8/5
(38)

Explain PERT analysis.

(Essay)
4.7/5
(30)

Integrated CASE tools are used to support tasks that happen throughout the SDLC.

(True/False)
4.8/5
(38)

Happy customers is a tangible cost that can be included in a cost-benefit analysis.

(True/False)
4.9/5
(30)

Identify the seven steps involved in conducting the economic feasibility.

(Essay)
4.9/5
(37)

The network diagram is a graphical way that lays out the project tasks in a flowchart to look at project workplan information.

(True/False)
4.7/5
(43)

What process do we use to estimate systems development based on use cases?

(Essay)
5.0/5
(37)

A highly effective motivational technique for technical staff is to provide recognition for each team member's accomplishments.

(True/False)
4.8/5
(41)

Using the shortcut method to determine the complexity of a systems project, a very complex system having 300 unadjusted function points would have 405 adjust function points.

(True/False)
4.8/5
(38)

To identify the tasks for a work plan the project manager can _____.

(Multiple Choice)
4.8/5
(37)

_____ feasibility is determined by identifying costs and benefits associated with the system.

(Multiple Choice)
4.8/5
(33)

Traditional Work Breakdown Structures tend to

(Multiple Choice)
4.8/5
(42)

Jim Smith, the project manager for a high-profile project, has permitted the users to add additional features to the systems project. The schedule and costs are now running over. This project suffers from poor standards.

(True/False)
4.9/5
(39)

The hurricane model implies that project estimates become more accurate as the project's product becomes better understood.

(True/False)
4.9/5
(39)

In a jelled team, team members enjoy doing their work.

(True/False)
4.8/5
(38)