Exam 2: Project Management
Exam 1: Introduction to Systems Analysis and Design127 Questions
Exam 2: Project Management176 Questions
Exam 3: Requirements Determination92 Questions
Exam 4: Business Process and Functional Modeling87 Questions
Exam 5: Structural Modeling94 Questions
Exam 6: Behavioral Modeling83 Questions
Exam 7: Moving on to Design98 Questions
Exam 8: Class and Method Design92 Questions
Exam 9: Data Management Layer Design91 Questions
Exam 10: Human Computer Interaction Layer Design94 Questions
Exam 11: Physical Architecture Layer Design85 Questions
Exam 12: Construction95 Questions
Exam 13: Installation and Operations116 Questions
Select questions type
Lower CASE tools are used to create integrated diagrams of the system and store information about system components during the analysis phase.
(True/False)
4.7/5
(35)
The evolutionary Work Breakdown Structure approach is very useful when the requirements of the system are not well understood.
(True/False)
4.9/5
(36)
Discuss the options a project manager has if a phase of a project is completed (a) earlier than expected, and (b) later than expected.
(Essay)
4.9/5
(38)
The critical path in a network diagram is the shortest path from the project inception to completion.
(True/False)
4.7/5
(38)
Determining whether the new system will be compatible with the existing technology that already exists in the organization is part of the organizational feasibility study.
(True/False)
4.9/5
(40)
Most system requests include all of the following except _____.
(Multiple Choice)
4.8/5
(38)
Integrated CASE tools are used to support tasks that happen throughout the SDLC.
(True/False)
4.8/5
(38)
Happy customers is a tangible cost that can be included in a cost-benefit analysis.
(True/False)
4.9/5
(30)
Identify the seven steps involved in conducting the economic feasibility.
(Essay)
4.9/5
(37)
The network diagram is a graphical way that lays out the project tasks in a flowchart to look at project workplan information.
(True/False)
4.7/5
(43)
What process do we use to estimate systems development based on use cases?
(Essay)
5.0/5
(37)
A highly effective motivational technique for technical staff is to provide recognition for each team member's accomplishments.
(True/False)
4.8/5
(41)
Using the shortcut method to determine the complexity of a systems project, a very complex system having 300 unadjusted function points would have 405 adjust function points.
(True/False)
4.8/5
(38)
To identify the tasks for a work plan the project manager can _____.
(Multiple Choice)
4.8/5
(37)
_____ feasibility is determined by identifying costs and benefits associated with the system.
(Multiple Choice)
4.8/5
(33)
Jim Smith, the project manager for a high-profile project, has permitted the users to add additional features to the systems project. The schedule and costs are now running over. This project suffers from poor standards.
(True/False)
4.9/5
(39)
The hurricane model implies that project estimates become more accurate as the project's product becomes better understood.
(True/False)
4.9/5
(39)
Showing 141 - 160 of 176
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)