Exam 10: Capacity and Scheduling Management
Exam 1: Introduction to Operations Management52 Questions
Exam 2: Strategic Operations Management55 Questions
Exam 3: Managing Services Operations44 Questions
Exam 4: Innovation58 Questions
Exam 6: Managing Inventory, MRP, ERP, and JIT60 Questions
Exam 7: Managing the Transformation Process47 Questions
Exam 9: Managing and Improving Quality40 Questions
Exam 8: Human Resources60 Questions
Exam 10: Capacity and Scheduling Management49 Questions
Exam 11: Sustainability42 Questions
Exam 12: The Future of Operations Management56 Questions
Select questions type
What is NOT a "v" in the 4V's of Capacity?
Free
(Multiple Choice)
4.8/5
(37)
Correct Answer:
D
Organizational Congruence is the extent to which all managerial levels within the firm share a common vision and work together towards a common purpose
Free
(True/False)
4.9/5
(40)
Correct Answer:
True
Demand smoothing provides the same level of supply, no matter what the demand level.
Free
(True/False)
4.9/5
(37)
Correct Answer:
True
Strategic capacity involves decisions that deal with the relatively long term positioning of the organization.
(True/False)
4.9/5
(44)
The potential output of a system that may be produced in a specified time, determined by the size, scale and configuration of the system's transformation inputs refers to:
(Multiple Choice)
4.7/5
(41)
What are the possible ways of improving capacity and their respective advantages and disadvantages?
(Essay)
4.8/5
(32)
Schmenner and Swink's "law of bottlenecks" states that productivity is improved if the rate of flow is consistent throughout the whole process.
(True/False)
4.9/5
(40)
This type of capacity is typically used within service organizations to smooth out the relationship between demand and supply:
(Multiple Choice)
4.8/5
(37)
Explain the difference in managing capacity between production and services.
(Essay)
4.8/5
(34)
Capacity is the potential output of a system that may be produced in a specific time, determined by the size, scale and configuration of the system's transformation inputs.
(True/False)
5.0/5
(43)
This type of manager is responsible for more than one brand and applies creative solutions to each of their units within the context of overarching policy guidelines and marketing strategies:
(Multiple Choice)
4.8/5
(28)
Adding capacity in advance of demand growth', is which type of capacity?
(Multiple Choice)
4.8/5
(38)
"The greater the random variability, either demanded of the process or inherent in the process itself or the items processed, the less productive the process" is referring to:
(Multiple Choice)
4.7/5
(24)
Capacity is the potential output of a system that may be produced in a specific time, determined by the size, scale and configuration of the system's transformation inputs:
(True/False)
4.8/5
(40)
Explain how capacity affects a company's ability to respond to customers.
(Essay)
4.7/5
(40)
Productivity is improved if the rate of flow is consistent throughout the whole process refers to the law of:
(Multiple Choice)
4.9/5
(35)
Geographic density is the number of units in an area relative to the size of the area
(True/False)
4.7/5
(31)
Showing 1 - 20 of 49
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)