Exam 8: Project Management and Quality Control

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Changes to the project involve moving from:

Free
(Multiple Choice)
4.8/5
(43)
Correct Answer:
Verified

A

What is the critical path through the network above?

Free
(Multiple Choice)
4.8/5
(41)
Correct Answer:
Verified

B

If the Earned Value is equal to Actual Cost, it means:

Free
(Multiple Choice)
4.9/5
(37)
Correct Answer:
Verified

D

The five stages of the coping cycle are (in order):

(Multiple Choice)
4.8/5
(35)

The project life cycle consists of

(Multiple Choice)
4.9/5
(37)

Developing a technology is an example of

(Multiple Choice)
4.8/5
(47)

A critical path network diagram does NOT:

(Multiple Choice)
5.0/5
(35)

"How will conflicts over resources/facility usage between this and other projects be settled?", is critically settled at level

(Multiple Choice)
4.9/5
(31)

A Gantt chart is used to show a project timeline diagramatically.

(True/False)
4.9/5
(40)

Where was Total Quality Management first developed?

(Multiple Choice)
4.9/5
(31)

What would be the critical path if the duration of activity C increased to 10?

(Multiple Choice)
4.8/5
(40)

Favored technique for resolving conflict is

(Multiple Choice)
4.8/5
(42)

Level which includes disposition of project's assets and personnel, is

(Multiple Choice)
4.8/5
(33)

Resource requirement in project becomes constant while the project is in its _____ progress stage.

(Multiple Choice)
4.9/5
(34)

Projects provide an excellent growth environment for future executives and for developing

(Multiple Choice)
4.9/5
(33)

Dunphy and Stace (1993) identified:

(Multiple Choice)
4.9/5
(38)

Which of the following are key components of a Total Quality Management system?

(Multiple Choice)
4.8/5
(40)

Five dimensions that must be managed on a project

(Multiple Choice)
4.9/5
(41)

Considers the total cost of ownership, or development plus support costs, for a project.

(Multiple Choice)
4.9/5
(35)

Improving quality through small, incremental improvements is a characteristic of what type of quality management system?

(Multiple Choice)
4.9/5
(37)
Showing 1 - 20 of 23