Exam 13: Project Management and Software Development

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Who has ultimate responsibility for project risk?

Free
(Multiple Choice)
4.9/5
(42)
Correct Answer:
Verified

C

A _________ is developed using historical cost information that relates some software metric to the project cost.

Free
(Multiple Choice)
4.8/5
(34)
Correct Answer:
Verified

A

________focuses on developing change -tolerance software.

Free
(Multiple Choice)
4.7/5
(39)
Correct Answer:
Verified

A

A communication management plan identifies the relevant information that should be communicated to:

(Multiple Choice)
4.8/5
(32)

Which of the following is not considered as a risk in project management?

(Multiple Choice)
4.7/5
(32)

Which technique is applicable when other projects in the same analogy application domain have been completed?

(Multiple Choice)
4.7/5
(30)

successful projects recognize the continuous improvment towards the best value rather than adhering to__________.

(Multiple Choice)
4.9/5
(37)

_______milestones occure at the end of the elaboration phase.

(Multiple Choice)
4.9/5
(40)

The phases of a project life cycle are:

(Multiple Choice)
4.8/5
(38)

_________is the critical factor in understanding how to plan and execute a software development project.

(Multiple Choice)
4.7/5
(36)

A project is typically defined in terms of scope, time, cost and which other parameter?

(Multiple Choice)
4.8/5
(35)

Which of these is not one of the constraints of a project?

(Multiple Choice)
4.7/5
(32)

Optimal quality is reached at what point?

(Multiple Choice)
4.8/5
(33)

Which model is used during early stages of the system design after the requirements have been established?

(Multiple Choice)
4.9/5
(35)

Choose an internal software quality from given below:

(Multiple Choice)
5.0/5
(34)

Project risk management is best described as:

(Multiple Choice)
4.8/5
(31)

Identify the sub-process of process improvement

(Multiple Choice)
4.8/5
(32)

Which one of the following best describes a project issue?

(Multiple Choice)
4.9/5
(32)

The process each manager follows during the life of a project is known as

(Multiple Choice)
4.9/5
(39)

Which of the following is NOT a project management cause of failed projects?

(Multiple Choice)
4.9/5
(26)
Showing 1 - 20 of 26
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)