Following is (are) the component(s) of risk management

Free
(Multiple Choice)
4.8/5
(31)
Correct Answer:
Verified

D

Resorce requirement in project becomes constant while the project is in its _____ progress stage.

Free
(Multiple Choice)
4.8/5
(43)
Correct Answer:
Verified

D

Developing a technology is an example of

Free
(Multiple Choice)
4.7/5
(34)
Correct Answer:
Verified

B

Five dimensions that must be managed on a project

(Multiple Choice)
4.9/5
(29)

Following is(are) the responsibility(ies) of the project manager.

(Multiple Choice)
4.8/5
(27)

Following are the characteristics of Project Mindset.

(Multiple Choice)
4.9/5
(39)

In the initial stage of the project the probability of completing the project is ___ .

(Multiple Choice)
4.8/5
(35)

Which of the following is responsible for the quality of the project deliverables?

(Multiple Choice)
4.7/5
(35)

The probability of completing the project can be estimated based upon the ____ .

(Multiple Choice)
4.8/5
(35)

According to Olivier Mesly, the 4 P's critical for the success of a project are:

(Multiple Choice)
4.9/5
(28)

Project performance consists of

(Multiple Choice)
4.9/5
(37)

Following are the phases of Project Management Life Cycle. Arrange them in correct order 1)Design 2) Marketing 3) Analysis and evaluation 4) Inspection, testing and delivery

(Multiple Choice)
4.9/5
(29)

QC is typically a(n) _______________ process.

(Multiple Choice)
4.8/5
(27)

Which one of the following is not an attribute of a project?

(Multiple Choice)
4.8/5
(25)

Each component of the software product is separately estimated and the results aggregated to produce an estimate for the overall job.

(Multiple Choice)
4.9/5
(34)

In quality management, which of the following is not an attribute of the cost of nonconformance?

(Multiple Choice)
4.9/5
(36)

The business case and the justification for the project is determined during the _____ phase.

(Multiple Choice)
4.9/5
(30)

Which one of the following is not a characteristic of a Project?

(Multiple Choice)
4.7/5
(41)

How the project work will be carried out, monitored, and controlled? These questions are answered in which phase of the project management?

(Multiple Choice)
4.8/5
(44)

Design phase consist of

(Multiple Choice)