Exam 14: Drainage,waste,and Vent Installation
Exam 1: Plumbers Toolbox29 Questions
Exam 2: Power Tools31 Questions
Exam 3: Types of Pipe31 Questions
Exam 4: Fittings32 Questions
Exam 5: Valves and Devices24 Questions
Exam 6: Fixtures30 Questions
Exam 7: Faucets and Drain Assemblies22 Questions
Exam 8: Plumbing Equipment and Appliances39 Questions
Exam 9: Blueprint Reading and Drafting33 Questions
Exam 10: Material Organization and Layout26 Questions
Exam 11: Water Service Installation30 Questions
Exam 12: Water Distribution Installation35 Questions
Exam 13: Drainage,waste,and Vent Segments and Sizing30 Questions
Exam 14: Drainage,waste,and Vent Installation27 Questions
Exam 15: Fixture and Equipment Installation24 Questions
Exam 16: Plumbing Repairs and Troubleshooting27 Questions
Exam 17: Hydronic Heat25 Questions
Select questions type
The height at which a vent pipe terminates above a roof varies based on local code.
Free
(True/False)
4.9/5
(38)
Correct Answer:
True
MATCHING
Match the following terms:
-A bathroom consisting of a tub or shower,a toilet,and a lavatory.
Free
(Multiple Choice)
4.9/5
(35)
Correct Answer:
A
A plumber must view the entire pipe route before committing to drilling holes.
Free
(True/False)
4.7/5
(29)
Correct Answer:
True
An ____________________ is allowable by many codes to eliminate the need for some vents being installed so that they terminate to open air and is abbreviated as AAV.
(Short Answer)
4.9/5
(36)
Most codes dictate that the 1-1/2" drain with a 1-1/2" p-trap cannot travel more than _____.
(Short Answer)
4.9/5
(33)
Testing a DWV system is typically performed with _______________ and some codes allow air to be used.
(Short Answer)
4.9/5
(45)
It is not uncommon for an architect to locate the plumbing fixtures on the exterior wall of a house.
(True/False)
4.8/5
(36)
Exterior walls that have a _____" waste stack may have to be constructed with 2"×6" wall studs instead of 2"×4" wall studs to accommodate the 3" pipe and fittings.
(Short Answer)
4.8/5
(30)
MATCHING
Match the following terms:
-A bathroom consisting of only a toilet and a lavatory.
(Multiple Choice)
4.7/5
(26)
MATCHING
Match the following terms:
-Several types are available,but they are all used to seal over a pipe end for testing a DWV system.
(Multiple Choice)
4.8/5
(33)
MATCHING
Match the following terms:
-Heavy-duty hand-operated pump sold for the plumbing industry to inject air into a test ball.
(Multiple Choice)
4.9/5
(33)
A ____________________ is required when a tiled shower base is installed on a wood floor.
(Short Answer)
4.9/5
(32)
The project scope of work is the specific installation requirements of a fixture.
(True/False)
4.9/5
(31)
MATCHING
Match the following terms:
-A testing accessory that inserts into a pipe end for testing purposes;several types are available.
(Multiple Choice)
4.8/5
(28)
MATCHING
Match the following terms:
-Word used to describe the rough-in dimension from the back wall to the center of the toilet drain.
(Multiple Choice)
4.8/5
(38)
What is the minimum and maximum vertical distance of the standpipe that most codes dictate for a washing machine box to the inlet of a p-trap?
(Essay)
4.8/5
(33)
The distance a trap can be installed from its vent is known as ____________________.
(Short Answer)
4.9/5
(25)
MATCHING
Match the following terms:
-A testing accessory that is injected with air after being inserted into a drainage pipe to allow the system to be filled with water.
(Multiple Choice)
4.8/5
(26)
Showing 1 - 20 of 27
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)