Exam 5: Process Improvement: Reducing Waste Through Lean
Exam 1: Operations Strategy and Global Competitiveness27 Questions
Exam 2: Process Planning and Design27 Questions
Exam 3: Controlling Processes27 Questions
Exam 4: Process Improvement: Minimizing Variation Through Six Sigma32 Questions
Exam 5: Process Improvement: Reducing Waste Through Lean29 Questions
Exam 6: Managing Process Improvement Projects29 Questions
Exam 7: Supply Chain Management30 Questions
Exam 8: Capacity, Scheduling, and Location Planning32 Questions
Select questions type
The step in the 5s approach in which unnecessary steps are eliminated is called:
Free
(Multiple Choice)
4.7/5
(31)
Correct Answer:
A
The goal of single minute exchange of die is to reduce setup times to less than 10 minutes.
Free
(True/False)
4.8/5
(30)
Correct Answer:
True
In traditional approaches to production,preventive maintenance is also common.
Free
(True/False)
4.8/5
(29)
Correct Answer:
True
The __________ offers a systematic way to view and analyze process flows.
(Multiple Choice)
4.7/5
(39)
The following are characteristics of Lean when contrasted with traditional systems,EXCEPT:
(Multiple Choice)
4.8/5
(26)
Which of the following is FALSE about Optimized Production Technology (OPT)?
(Multiple Choice)
4.8/5
(33)
The step in the 5S approach in which standardized procedures for maintaining an orderly work environment are developed and implemented is:
(Multiple Choice)
4.8/5
(39)
Which of the following is/are (a)primary tenet(s)in the Japanese work systems?
(Multiple Choice)
4.9/5
(41)
The goal of this approach is to mistake-proof work activities in a way that prevents errors from being committed in the first place:
(Multiple Choice)
4.9/5
(35)
Repairing a machine when it breaks down,as opposed to conducting maintenance before it is expected to fail,or at regular intervals is also known as ______ maintenance.
(Short Answer)
4.8/5
(38)
Lean enterprises rely on the push system,whereby company supply drives the production process.
(True/False)
4.8/5
(34)
The idea of authorizing materials for production only if there is a need for them originated the materials management system known as ________.
(Short Answer)
5.0/5
(38)
The lean tool to reduce setup times is SMED; this acronym stands for
(Multiple Choice)
4.8/5
(38)
Japanese production approaches such as JIT could not be applied in the United States because companies do not show much respect and loyalty to their employees.
(True/False)
4.9/5
(40)
Which of the following is NOT one of the seven categories of waste or muda?
(Multiple Choice)
4.8/5
(34)
Mixed-model assembly requires optimized production technology (OPT)for sequencing.
(True/False)
4.7/5
(36)
A measure of overall ________ ________ is calculated as the product of equipment availability,equipment efficiency,and the rate of quality output.