Which of the following is NOT an original component of reengineering?

Free
(Multiple Choice)
4.7/5
(40)
Correct Answer:
Verified

C

The Six Sigma approach originated at Motorola.

Free
(True/False)
4.8/5
(37)
Correct Answer:
Verified

True

Which term compares an organization's processes with the best practices to be found in its industry or others?

Free
(Multiple Choice)
4.7/5
(35)
Correct Answer:
Verified

A

A literal interpretation of six-sigma is:

(Multiple Choice)
4.8/5
(42)

Which of the following tools and methodologies is NOT used in the Measure Phase of Six Sigma?

(Multiple Choice)
4.9/5
(38)

Six Sigma (DMAIC)is best applied when:

(Multiple Choice)
4.8/5
(32)

An expectation of Business Process Design is that the improvements in performance will be at a minimum incremental.

(True/False)
4.9/5
(40)

Developing and evaluating solutions to reduce the gap between desired process performance and current performance is the final step in the six sigma DMAIC approach for process improvement.

(True/False)
4.9/5
(38)

Six Sigma is among the most timely topics in business today because of the following,EXCEPT:

(Multiple Choice)
4.9/5
(38)

Business Process Design (BPD)is also adequately named the following EXCEPT:

(Multiple Choice)
4.9/5
(42)

The relationship between the natural variation in the production system and the product's design specifications can be quantified using:

(Multiple Choice)
4.7/5
(29)

Six Sigma is better applied on for-profit than in nonprofit organizations.

(True/False)
4.8/5
(41)

Which of the following is FALSE about Quality Function Deployment (QFD)?

(Multiple Choice)
4.8/5
(38)

The following are shortcomings associated with analyzing problems "one factor at a time" (also known as OFAT and 1FAT)EXCEPT:

(Multiple Choice)
4.8/5
(32)

DMAIC stands for:

(Multiple Choice)
4.8/5
(34)

Defects per million opportunities (DPMO)and Process Sigma are the most important tools for the Measure Phase of Six Sigma.

(True/False)
4.8/5
(35)

Which of the following is NOT a part of a House of Quality display?

(Multiple Choice)
4.8/5
(38)

Choose a common problem from the measure phase.

(Multiple Choice)
4.8/5
(44)

Lean Sigma is a combination of Six Sigma and Lean tools appropriate when both too much variation and waste exist in a process.

(True/False)
4.8/5
(40)

In order to claim status as a Six Sigma Black Belt,it has become customary for individuals to undergo a process of ________.

(Short Answer)
4.8/5
(41)
Showing 1 - 20 of 32