Exam 8: Capacity, Scheduling, and Location Planning
Exam 1: Operations Strategy and Global Competitiveness27 Questions
Exam 2: Process Planning and Design27 Questions
Exam 3: Controlling Processes27 Questions
Exam 4: Process Improvement: Minimizing Variation Through Six Sigma32 Questions
Exam 5: Process Improvement: Reducing Waste Through Lean29 Questions
Exam 6: Managing Process Improvement Projects29 Questions
Exam 7: Supply Chain Management30 Questions
Exam 8: Capacity, Scheduling, and Location Planning32 Questions
Select questions type
The more __________ the service,the longer it is worth waiting for.
Free
(Short Answer)
4.9/5
(43)
Correct Answer:
valuable
The physical release of a work order from the production planning and control department to operations is called ___________.
Free
(Short Answer)
4.8/5
(43)
Correct Answer:
dispatching
The first step to enhance the development of long-term capabilities is to identify potential locations.
Free
(True/False)
4.9/5
(44)
Correct Answer:
False
In addition to showing time schedules,Gantt charts can also be used for capacities of facilities,workers,jobs,activities,and so forth.
(True/False)
4.9/5
(47)
After a region of a new facility has been selected,candidate communities within the region are identified for further analysis.
(True/False)
4.9/5
(42)
The most important factor(s)effecting the learning curve rate include(s):
(Multiple Choice)
4.8/5
(34)
Bottlenecks are places in the production process where production slows down because of a slow or insufficient number of resources.
(True/False)
4.9/5
(36)
In the allocation of capacity,overbooking is an attempt to reduce costs through better schedule management.
(True/False)
4.8/5
(43)
The __________ plan is a preliminary,approximate schedule of an organization's overall operations that will satisfy the demand forecast at minimum cost.
(Multiple Choice)
4.8/5
(35)
The cycle time of the process is the reciprocal of the output rate.
(True/False)
4.7/5
(40)
Organizations such as makers of greeting cards,of summer or winter products and of fireworks face a cyclic difficulty referred to as _________.
(Short Answer)
4.9/5
(45)
In planning the long-term capacity of an operation,one should take into account:
(Multiple Choice)
4.7/5
(42)
Obtaining lower unit costs through the use of larger facilities is called economies of scope.
(True/False)
4.8/5
(43)
Assume that Company F produces a variety of smart phones sequentially on three machines.The times required on each machine for one typical racket are as follows: M1: 3 minutes M2: 8 minutes,M3: 2 minutes,M4: 5 minutes.The throughput time for a smart phone is :
(Multiple Choice)
4.7/5
(27)
Which of the following is/are (a)technique(s)used for increasing short-run capacity
(Multiple Choice)
4.8/5
(33)
Showing 1 - 20 of 32
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)
- Matching(0)