  -Over time, the distinctions between the Program Evaluation Review Technique (PERT) and the Critical Path Method (CPM) have disappeared, and today the scheduling technique is called ____________________, as represented in the accompanying figure. -Over time, the distinctions between the Program Evaluation Review Technique (PERT) and the Critical Path Method (CPM) have disappeared, and today the scheduling technique is called ____________________, as represented in the accompanying figure.

(Short Answer)
4.8/5
(33)

MATCHING Identify the letter of the choice that best matches the phrase or definition. a.project management f.weight b.project coordinator g.bottom-up technique c.project leader h.dependent d.milestone i.concurrent e.constraint j.predecessor -What would a basic list of risk management steps include?

(Essay)
4.9/5
(33)

MATCHING Identify the letter of the choice that best matches the phrase or definition. a.project management f.weight b.project coordinator g.bottom-up technique c.project leader h.dependent d.milestone i.concurrent e.constraint j.predecessor -Project managers typically perform four main tasks. Identify these and explain what they are.

(Essay)
4.8/5
(47)

MATCHING Identify the letter of the choice that best matches the phrase or definition. a.project management f.weight b.project coordinator g.bottom-up technique c.project leader h.dependent d.milestone i.concurrent e.constraint j.predecessor -A condition, restriction, or requirement that the system must satisfy.

(Short Answer)
4.7/5
(39)

When tasks must be completed one after another, they are called concurrent tasks.

(True/False)
4.8/5
(36)

Critical time is the amount of time that a task would be late without pushing back the completion date of the entire project. _________________________

(True/False)
4.9/5
(40)

Structured walk-throughs take place throughout the SDLC and are called ____ reviews, depending on the phase in which they occur.

(Multiple Choice)
4.9/5
(35)

  -The PERT chart called a network diagram in the accompanying figure represents a bottom-up technique, because it analyzes a large, complex project as a series of individual ____________________. -The PERT chart called a network diagram in the accompanying figure represents a bottom-up technique, because it analyzes a large, complex project as a series of individual ____________________.

(Short Answer)
4.9/5
(35)

A ____ might involve maximums for one or more resources.

(Multiple Choice)
4.9/5
(35)

For a project manager, reporting _____.

(Multiple Choice)
4.8/5
(37)

MATCHING Identify the letter of the choice that best matches the phrase or definition. a.project management f.weight b.project coordinator g.bottom-up technique c.project leader h.dependent d.milestone i.concurrent e.constraint j.predecessor -PERT/CPM is an example.

(Short Answer)
4.9/5
(32)

____ is a possible cause of cost overruns related to human resource issues.

(Multiple Choice)
4.8/5
(40)

When two or more concurrent tasks depend on a single prior task, the concurrent tasks are called ____ tasks.

(Multiple Choice)
4.9/5
(42)

Project managers always must be aware of the ____ path, so they can monitor the vital tasks and keep the project on track.

(Multiple Choice)
5.0/5
(42)

Project management is dynamic and challenging, regardless of which software you use..

(True/False)
4.9/5
(39)

_____ is a full-featured program that holds the dominant share of the project management software market.

(Multiple Choice)
4.7/5
(44)

  -A(n) ____________________ is a series of tasks with no slack time. -A(n) ____________________ is a series of tasks with no slack time.

(Short Answer)
4.9/5
(29)

  -A project is based on a pattern of ____________________. -A project is based on a pattern of ____________________.

(Short Answer)
4.9/5
(34)

In any project, large or small, tasks depend on each other and must be performed in a sequence.

(True/False)
4.9/5
(27)

  -When estimating the duration of a task, the project manager makes three time estimates for the task and then assigns a(n) ____________________, which is an importance value, to each estimate. -When estimating the duration of a task, the project manager makes three time estimates for the task and then assigns a(n) ____________________, which is an importance value, to each estimate.

(Short Answer)
4.8/5
(43)