Exam 19: Change Management With Faster Project Completions

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

On what is the Ferris Wheel model for continuous project management based?

(Essay)
4.9/5
(36)

Which of the following is one of the four principles of capabilities-based management?

(Multiple Choice)
4.8/5
(36)

Capabilities-based strategies reflect smart management of business processes.

(True/False)
4.9/5
(36)

Which of the following should we focus on for successful reengineering?

(Multiple Choice)
4.8/5
(33)

Pilot studies are scaled-down models of the factory or service system.

(True/False)
4.8/5
(39)

Define vision (V).What are synonyms for this term?

(Essay)
4.7/5
(44)

The measure of "inventory turns per year" is increasingly used by retailers in preference to direct measures of profit.

(True/False)
4.9/5
(30)

When is benchmarking the trigger for dissatisfaction?

(Essay)
4.8/5
(38)

_____ separate(s) regions using boundaries that reflect combined power to deliver improvements.The more the power the greater the circumference.

(Multiple Choice)
4.8/5
(33)

_____ plays a guiding role in continuous improvement.

(Multiple Choice)
4.9/5
(33)

The American Assembly met to discuss how to get declining U.S.productivity back on track.At this conference,major discussions centered around

(Multiple Choice)
4.9/5
(33)

Concurrent engineering is a time-based management approach that employs more resources earlier in a team-oriented framework than the sequential,compartmentalized project engineering method.

(True/False)
4.8/5
(25)

Design for manufacturing and design for assembly are subject to

(Multiple Choice)
4.9/5
(27)

Use the Gleicher model with D = 8,V = 6,P = 0.5 and C = 50.Assume that D and V are scaled 0 to 10 while P ranges from 0 to 1.C is measured from 0 to 100.In this case,dissatisfaction is high but there is not a strong vision for the future.The product for change is 24 which is substantially less than 50 so change is unlikely.Then,a consulting firm is hired which recommends a 20 percent workforce reduction.What probable effect will this action have on the product for change?

(Essay)
4.9/5
(30)

Time-based management is responsible for fast delivery of goods and services to customers and rapid development of new products.

(True/False)
4.7/5
(34)

Benchmarking may be used in many ways.For example,it is helpful to comparing your own personal ability,say in lifting weights,with a friend's ability.You can chart your progress and compare it with your colleague's progress.You can compare your department's performance,with Best Practices in other firms and/or other departments in your own firm.

(True/False)
4.8/5
(31)

Benchmarking can trigger dissatisfaction with the status quo.Conversely,benchmarks have the power to influence behavior in unexpected ways,even counter-productive ways.

(True/False)
4.9/5
(27)

_____ reflect integrity to protect employees from noxious fumes,toxic substances,unsafe machines,nonsanitary facilities,jumbled storage,and combustible materials.

(Multiple Choice)
4.8/5
(28)

_____ is parallel and simultaneous work along many project paths.

(Multiple Choice)
4.7/5
(39)

Using the Gleicher model,if: D = 5,V = 9,P = 1,and C = 38.Will the organization be likely to accept change? Assume D and V are scaled 0 to 10 and that P is either 1 or 0.Also,assume that C is measured from 0 to 100.

(Essay)
4.9/5
(36)
Showing 41 - 60 of 103
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)