Exam 19: Change Management With Faster Project Completions
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
On what is the Ferris Wheel model for continuous project management based?
(Essay)
4.9/5
(36)
Which of the following is one of the four principles of capabilities-based management?
(Multiple Choice)
4.8/5
(36)
Capabilities-based strategies reflect smart management of business processes.
(True/False)
4.9/5
(36)
Which of the following should we focus on for successful reengineering?
(Multiple Choice)
4.8/5
(33)
Pilot studies are scaled-down models of the factory or service system.
(True/False)
4.8/5
(39)
The measure of "inventory turns per year" is increasingly used by retailers in preference to direct measures of profit.
(True/False)
4.9/5
(30)
_____ separate(s) regions using boundaries that reflect combined power to deliver improvements.The more the power the greater the circumference.
(Multiple Choice)
4.8/5
(33)
The American Assembly met to discuss how to get declining U.S.productivity back on track.At this conference,major discussions centered around
(Multiple Choice)
4.9/5
(33)
Concurrent engineering is a time-based management approach that employs more resources earlier in a team-oriented framework than the sequential,compartmentalized project engineering method.
(True/False)
4.8/5
(25)
Design for manufacturing and design for assembly are subject to
(Multiple Choice)
4.9/5
(27)
Use the Gleicher model with D = 8,V = 6,P = 0.5 and C = 50.Assume that D and V are scaled 0 to 10 while P ranges from 0 to 1.C is measured from 0 to 100.In this case,dissatisfaction is high but there is not a strong vision for the future.The product for change is 24 which is substantially less than 50 so change is unlikely.Then,a consulting firm is hired which recommends a 20 percent workforce reduction.What probable effect will this action have on the product for change?
(Essay)
4.9/5
(30)
Time-based management is responsible for fast delivery of goods and services to customers and rapid development of new products.
(True/False)
4.7/5
(34)
Benchmarking may be used in many ways.For example,it is helpful to comparing your own personal ability,say in lifting weights,with a friend's ability.You can chart your progress and compare it with your colleague's progress.You can compare your department's performance,with Best Practices in other firms and/or other departments in your own firm.
(True/False)
4.8/5
(31)
Benchmarking can trigger dissatisfaction with the status quo.Conversely,benchmarks have the power to influence behavior in unexpected ways,even counter-productive ways.
(True/False)
4.9/5
(27)
_____ reflect integrity to protect employees from noxious fumes,toxic substances,unsafe machines,nonsanitary facilities,jumbled storage,and combustible materials.
(Multiple Choice)
4.8/5
(28)
_____ is parallel and simultaneous work along many project paths.
(Multiple Choice)
4.7/5
(39)
Using the Gleicher model,if: D = 5,V = 9,P = 1,and C = 38.Will the organization be likely to accept change? Assume D and V are scaled 0 to 10 and that P is either 1 or 0.Also,assume that C is measured from 0 to 100.
(Essay)
4.9/5
(36)