The use of line-balancing for IFS is common when batch sizes are small enough to warrant a temporary serial form of production.

Free
(True/False)
4.9/5
(37)
Correct Answer:
Verified

False

Heuristic approaches to line balancing are _____ than robust quantitative procedures.

Free
(Multiple Choice)
4.9/5
(27)
Correct Answer:
Verified

A

Operational decisions made on the plant floor without requiring downward review provide significant competitive advantage.

Free
(True/False)
4.7/5
(39)
Correct Answer:
Verified

False

In practice,acceptable complex formulations using linear programming have been devised to obtain optimal solutions to the line-balancing problems.

(True/False)
4.8/5
(35)

Queues can form when stochastic behavior characterizes any operation time,tᵢ,.

(True/False)
4.8/5
(42)

Decreasing cycle time by working smarter and not harder has the effect of:

(Multiple Choice)
4.7/5
(36)

With respect to the O.O.D.A.loop,fighter pilots must achieve rapid orientation.Dictionaries define orientation in terms of both psychological as well as physical positioning.

(True/False)
4.8/5
(42)

_____ is a related measure to balance delay as it is used to assess how well the line is balanced.

(Multiple Choice)
4.9/5
(37)

Explain a "pull" production system.

(Essay)
4.9/5
(32)

Can perfect balance be achieved? Why?

(Essay)
4.8/5
(37)

The concept of continuous process improvement (instead of reengineering a radical change) never applies to cycle-time reduction.

(True/False)
4.9/5
(40)

Push-type production systems create

(Multiple Choice)
4.8/5
(43)

View the painting booth in an automobile-assembly plant as a stochastic,single-channel,input-output system with Poisson arrivals and exponential service times.Determine the values of P₀ and P₁ ,and Pn>₁ for l = 8 per hour and m = 10 per hour.Note: FIFO holds as well as all other assumptions required for the single-channel queuing model.

(Essay)
4.8/5
(31)

At which of the following work locations does the participation of people increase the variability of output rates?

(Multiple Choice)
4.8/5
(31)

Tactical timing goals must synchronize cycles of all

(Multiple Choice)
4.8/5
(37)

Queuing models describe systems behaviors with different service resource allocations and they provide optimum solutions for output rates and cycle times.

(True/False)
4.8/5
(29)

Which of the following is descriptive of TWC?

(Multiple Choice)
4.7/5
(31)

What does line balancing attempt to equalize on the production line? Why?

(Essay)
4.7/5
(37)

_____ line-balancing methods employ "rule of thumb," common sense,logical thinking,and experience to find near-optimal solutions for large problems.

(Multiple Choice)
4.9/5
(49)

A kanban is any method that calls attention to the fact that the next station wishes to stop further deliveries.

(True/False)
4.8/5
(39)
Showing 1 - 20 of 117