Exam 16: Production Scheduling for Manufacturing and Service Operations

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Gantt layout charts provide work schedule control and they are a great help in determining the best work sequences.

Free
(True/False)
4.9/5
(38)
Correct Answer:
Verified

False

When customers who regularly submit long orders are discriminated against by the shortest processing rule,what is the appropriate step that can be taken at the discretion of those doing the sequencing?

Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
Verified

A

_____ is (are) designed to eliminate all bottlenecks by preengineering.

Free
(Multiple Choice)
5.0/5
(30)
Correct Answer:
Verified

D

_____ and _____ are done over and over again in a typical job shop.

(Multiple Choice)
4.8/5
(37)

Loading assumes that the material requirements analysis has been done and that orders have been properly placed for the required _____.

(Multiple Choice)
4.8/5
(26)

Sequencing inflexibility occurs when the updating of charts (redrawing them) is supported by software.

(True/False)
4.8/5
(36)

Shop loading is required to assign specific jobs or teams to specific facilities.

(True/False)
4.8/5
(28)

In terms of processing times,FIFO is often a random sequence-without regard to SPT.This is true when any length job is as likely to enter the shop first as any other.

(True/False)
4.7/5
(46)

The definition of profit opportunity cost is the cost of assigning a job to a facility that

(Multiple Choice)
4.9/5
(38)

By using a ratio,the production scheduler who is doing the sequencing gains greater control over the factors.

(True/False)
4.9/5
(26)

The Gantt layout chart shows the job schedule at each facility and the state of completion of all jobs.

(True/False)
4.8/5
(40)

S.M.Johnson's algorithm derives the minimum completion times for all "no passing" cases."No passing" means:

(Multiple Choice)
4.8/5
(39)

For synchronized manufacturing,complex flow patterns are analyzed by

(Multiple Choice)
4.8/5
(40)

The assignment method is used to

(Multiple Choice)
4.9/5
(34)

For each machine,when the SMH index is divided by the actual machine hours available per week,the standard machine hours (SMH) available per week are obtained.

(True/False)
4.8/5
(35)

When determining flow times,beginning at time zero with the first job is the same as saying that release time,called rᵢ,equals zero.This might be the start of a new day,week,etc.

(True/False)
4.9/5
(44)

In facility loading,constant matching of estimated and actual times:

(Multiple Choice)
4.7/5
(40)

Too much job waiting is called _____.

(Multiple Choice)
4.8/5
(41)

Define production and operations scheduling.

(Essay)
4.9/5
(34)

The _____ model is based on opportunity costs,which are the costs of not making the best possible assignments of jobs to facilities and vice versa.

(Multiple Choice)
4.9/5
(45)
Showing 1 - 20 of 116
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)