Exam 16: Production Scheduling for Manufacturing and Service Operations
Exam 1: Product Line Planning and the Systems Approach114 Questions
Exam 2: Productivity and Strategic Planning115 Questions
Exam 3: Demand Creation and Predictive Planning114 Questions
Exam 4: Understanding Quality: ITS Management and Strategic Importance114 Questions
Exam 5: Process Configuration Strategies111 Questions
Exam 6: Process Analysis and Redesign115 Questions
Exam 7: Quality Assurance115 Questions
Exam 8: Management of Technology Mot101 Questions
Exam 9: Teamwork Planning Requires Job Design113 Questions
Exam 10: Supply Chain Capacity Planning113 Questions
Exam 11: Facilities Planning: Location and Layout112 Questions
Exam 12: Materials Management Impacts All Supply Chain Participants110 Questions
Exam 13: Aggregate Planning to Balance Supply and Demand106 Questions
Exam 14: Inventory Management for Smooth and Continuous Demand Patterns114 Questions
Exam 15: Material Requirements Planning Mrp for Sporadic Demand Patterns116 Questions
Exam 16: Production Scheduling for Manufacturing and Service Operations116 Questions
Exam 17: Cycle-Time Management Increases Productivity117 Questions
Exam 18: Project Management for New Products and Processes110 Questions
Exam 19: Change Management With Faster Project Completions103 Questions
Exam 20: Sustainability Issues: Environment, Ethics, and Security111 Questions
Select questions type
Gantt layout charts provide work schedule control and they are a great help in determining the best work sequences.
Free
(True/False)
4.9/5
(38)
Correct Answer:
False
When customers who regularly submit long orders are discriminated against by the shortest processing rule,what is the appropriate step that can be taken at the discretion of those doing the sequencing?
Free
(Multiple Choice)
4.8/5
(42)
Correct Answer:
A
_____ is (are) designed to eliminate all bottlenecks by preengineering.
Free
(Multiple Choice)
5.0/5
(30)
Correct Answer:
D
_____ and _____ are done over and over again in a typical job shop.
(Multiple Choice)
4.8/5
(37)
Loading assumes that the material requirements analysis has been done and that orders have been properly placed for the required _____.
(Multiple Choice)
4.8/5
(26)
Sequencing inflexibility occurs when the updating of charts (redrawing them) is supported by software.
(True/False)
4.8/5
(36)
Shop loading is required to assign specific jobs or teams to specific facilities.
(True/False)
4.8/5
(28)
In terms of processing times,FIFO is often a random sequence-without regard to SPT.This is true when any length job is as likely to enter the shop first as any other.
(True/False)
4.7/5
(46)
The definition of profit opportunity cost is the cost of assigning a job to a facility that
(Multiple Choice)
4.9/5
(38)
By using a ratio,the production scheduler who is doing the sequencing gains greater control over the factors.
(True/False)
4.9/5
(26)
The Gantt layout chart shows the job schedule at each facility and the state of completion of all jobs.
(True/False)
4.8/5
(40)
S.M.Johnson's algorithm derives the minimum completion times for all "no passing" cases."No passing" means:
(Multiple Choice)
4.8/5
(39)
For synchronized manufacturing,complex flow patterns are analyzed by
(Multiple Choice)
4.8/5
(40)
For each machine,when the SMH index is divided by the actual machine hours available per week,the standard machine hours (SMH) available per week are obtained.
(True/False)
4.8/5
(35)
When determining flow times,beginning at time zero with the first job is the same as saying that release time,called rᵢ,equals zero.This might be the start of a new day,week,etc.
(True/False)
4.9/5
(44)
In facility loading,constant matching of estimated and actual times:
(Multiple Choice)
4.7/5
(40)
The _____ model is based on opportunity costs,which are the costs of not making the best possible assignments of jobs to facilities and vice versa.
(Multiple Choice)
4.9/5
(45)
Showing 1 - 20 of 116