Exam 4: Project Initiation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The higher the ROI,the better for the organization.

(True/False)
4.9/5
(27)

Professional characteristics of a project manager include

(Multiple Choice)
4.8/5
(32)

The construction of a new data center would be categorized as an emergency project.

(True/False)
4.8/5
(33)

Projects can be categorized as any of the following except

(Multiple Choice)
4.8/5
(32)

AHP is based on each of the following principles except

(Multiple Choice)
4.8/5
(34)

Requirements gathering is perhaps the most complex and critical process of any project success.

(True/False)
4.8/5
(31)

Project initiation consists of identifying and selecting projects and developing project charters for the selected projects.

(True/False)
4.9/5
(42)

Which of the following reviews various points where two or more systems interact with each other?

(Multiple Choice)
4.8/5
(29)

Project requirements can be gathered through brainstorming,focus groups,and facilitated workshops.

(True/False)
4.7/5
(46)

Stakeholder analysis does not include the ability to help mitigate the project risks.

(True/False)
4.8/5
(27)

Which of the following creates requirements from "as-is" process documents?

(Multiple Choice)
4.9/5
(36)

The purpose of the project charter is to

(Multiple Choice)
4.8/5
(43)

Which stakeholder group provides financial resources for the project?

(Multiple Choice)
4.8/5
(42)

Wheelwright and Clark's framework for classifying project types includes each of the following except

(Multiple Choice)
4.7/5
(38)

An organization should consider projects only if the NPV is negative.

(True/False)
4.8/5
(35)

Having a high energy level is a personal characteristic of a project manager.

(True/False)
4.8/5
(42)

A project charter should contain each of the following except project

(Multiple Choice)
4.8/5
(36)

Organizations usually prepare feasibility studies as the first means of starting a project.

(True/False)
5.0/5
(36)

A structured group meeting of stakeholders to gather requirements by actively involving the stakeholders to replace individual interviews best defines

(Multiple Choice)
4.8/5
(43)

Projects that are essential to support the long-range mission are categorized as

(Multiple Choice)
4.8/5
(34)
Showing 21 - 40 of 80
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)