Exam 11: Managing Systems Implementation
Exam 1: Introduction to Systems Analysis and Design80 Questions
Exam 2: Analyzing the Business Case81 Questions
Exam 3: Managing Systems Projects78 Questions
Exam 4: Requirements Modeling98 Questions
Exam 5: Data and Process Modeling84 Questions
Exam 6: Object Modeling78 Questions
Exam 7: Development Strategies82 Questions
Exam 8: User Interface Design82 Questions
Exam 9: Data Design86 Questions
Exam 10: System Architecture78 Questions
Exam 11: Managing Systems Implementation81 Questions
Exam 12: Managing Systems Support and Security81 Questions
Exam 13: Toolkit A: The Systems Analysts Toolkit45 Questions
Exam 14: Toolkit B: Case Tools44 Questions
Exam 15: Toolkit C: Financial Analysis Tools45 Questions
Exam 16: Toolkit D: Internet Resource Tools44 Questions
Select questions type
Many organizations require a more formal type of desk checking called _____.
(Multiple Choice)
4.8/5
(30)
Which of the following is specified by the detailed procedures in a test plan?
(Multiple Choice)
4.8/5
(35)
-In the given figure, a lower-level module is called a _____.

(Multiple Choice)
4.8/5
(33)
Lisa mentions that a program is developed to interact with other programs, and she wants to begin by testing the programs individually. Tina tells her about a process in which a programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully. What is the name of this process?
(Multiple Choice)
4.8/5
(37)
In sequence, the four steps typically followed to create a structure chart are _____.
(Multiple Choice)
4.9/5
(40)
_____ measures a module's scope and processing characteristics.
(Multiple Choice)
4.9/5
(30)
-The given figure shows a _____ module, which is reusable code and can be invoked from more than one point in a structure chart.

(Multiple Choice)
4.8/5
(39)
The main objective of _____ is to avoid problems or to identify them as soon as possible.
(Multiple Choice)
4.8/5
(32)
During _____, programmers must test programs that interact with other programs and files separately before they are integrated into the system.
(Multiple Choice)
4.9/5
(40)
When there are no system problems to be corrected or authorized enhancements to be made, access to the operational environment is limited to _____ and must strictly be controlled.
(Multiple Choice)
4.8/5
(31)
In a technique called _____, the programmer simulates each program outcome or result and displays a message to indicate whether or not the program executed successfully.
(Multiple Choice)
4.8/5
(39)
-A _____, such as that illustrated in the given figure, consists of rectangles that represent program modules, with arrows and other symbols that provide additional information.

(Multiple Choice)
5.0/5
(28)
Data conversion is easier when a new system replaces a manual system because all data can be entered manually, unless it must be scanned.
(True/False)
4.8/5
(41)
Phased operation is more expensive than full parallel operation because the analyst has to work with the entire system at any given time.
(True/False)
4.8/5
(34)
System developers use _____ to document and trail program defects, code changes, and replacement code.
(Multiple Choice)
4.8/5
(35)
In a structure chart, a(n) _____ line, with a diamond on one end, indicates that a control module determines which subordinate modules will be invoked.
(Multiple Choice)
4.8/5
(39)
Showing 21 - 40 of 81
Filters
- Essay(0)
- Multiple Choice(0)
- Short Answer(0)
- True False(0)