The CRAFT program for facility layout uses an initial solution to ________.

(Multiple Choice)
4.8/5
(33)

The advent of the "hub and spoke" airline network following deregulation is an example of ________.

(Multiple Choice)
4.9/5
(33)

Which of the following retail servicescapes would support an upscale store image best?

(Multiple Choice)
4.8/5
(34)

A process layout, done correctly, promotes standardized service.

(True/False)
4.8/5
(35)

The inability of a jewelry store to expand its current operations to include, for example, an in-store repair and manufacturing facility in response to customer demands, is neglecting which factor of service facility design?

(Multiple Choice)
4.9/5
(35)

Which one of the following is an example of a process layout?

(Multiple Choice)
4.8/5
(37)

A batch type of service process has the characteristic of ________.

(Multiple Choice)
4.7/5
(31)

Identify the bottleneck operation in the following exclusive hairdressing salon. Identify the bottleneck operation in the following exclusive hairdressing salon.

(Multiple Choice)
4.8/5
(30)

A fixed sequence of steps that all customers must experience is characteristic of process layouts.

(True/False)
4.8/5
(28)

Facility layout is discussed with attention to traffic flow, space planning, and which one of the following?

(Multiple Choice)
4.7/5
(32)

Which among the following choices might not be representative of security measures taken by retail stores?

(Multiple Choice)
4.9/5
(39)

Cycle time is the average time to complete a service operation.

(True/False)
4.9/5
(37)

Capacity utilization of individual operations is a dangerous performance metric.

(True/False)
4.9/5
(34)

The customer is a(n) ________ in the service process and his/her impression of the service quality is influenced by many ________.

(Multiple Choice)
4.9/5
(49)

Heuristic algorithms are not only appealing intuitively, but they also guarantee optimal solutions.

(True/False)
4.9/5
(35)

The product layout often requires special equipment and special skills to deal with high volume of demand for service that is anticipated. These factors create a very inflexible layout.

(True/False)
4.9/5
(32)

The swim lane flowchart highlights the handoffs between functional activities.

(True/False)
4.8/5
(37)

The line balancing problem arises because of ________.

(Multiple Choice)
4.9/5
(35)

________ is the time it takes to complete a process from time of arrival to time of departure.

(Multiple Choice)
4.9/5
(32)

The entire system capacity is measured by the inverse of the bottleneck cycle time.

(True/False)
4.7/5
(32)