Exam 9: Resource Allocation

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

The points between the extreme points of the relationship between time use and resource use represent __________.

(Multiple Choice)
4.8/5
(37)

Discuss the advantages obtained from resource leveling.

(Essay)
4.7/5
(40)

Which of the following describes a situation where priorities are assigned to activities according to some rule not associated with task length,slack,or resource requirements?

(Multiple Choice)
4.8/5
(36)

The two fundamental approaches to constrained allocation problems are __________.

(Multiple Choice)
4.7/5
(37)

The formula for computing the cost / time slope for each activity that can be crashed is __________.

(Multiple Choice)
4.9/5
(34)

The usual purpose of the __________ scheduling heuristic is to delay cash outflows as long as possible.

(Multiple Choice)
4.9/5
(35)

Describe the extreme points of the relationship between time use and resource use.

(Essay)
4.8/5
(40)

Describe the basic procedure for resource leveling.

(Essay)
4.9/5
(35)

One of the problems that Goldratt observed was that if an activity has slack time,the task might become delayed until the slack is removed.This is referred to as __________.

(Multiple Choice)
4.7/5
(26)

The standard practice with AOA and AON is to estimate activity times under the assumption of resource loadings that are __________.

(Multiple Choice)
4.9/5
(39)

If deterministic time estimates are used,and if project deadlines are firm,there is a high likelihood that it will __________.

(Multiple Choice)
5.0/5
(29)

List the factors that lead to strong optimistic bias.

(Essay)
4.8/5
(37)

Thoughtless optimism,the "student syndrome," and multitasking to reduce idle time can each contribute to __________.

(Multiple Choice)
4.8/5
(35)
Showing 41 - 53 of 53
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)