The use of __________ activity time estimates may reduce the chance that crashing the project will be needed.

(Multiple Choice)
4.8/5
(39)

__________ aims to minimize the period-by-period variations in resource loading by shifting tasks within their slack allowances.The purpose is to create a smoother distribution of resource usage.

(Multiple Choice)
4.9/5
(29)

Using Goldratt's meaning of the word "dependent," the activities of a project can be ordered into paths based on their resource dependencies as well as on their technological precedence requirements.The longest of these paths of sequentially time-dependent activities is known as the ______________.

(Multiple Choice)
4.9/5
(33)

__________ are tasks that logically follow a particular task in time.

(Multiple Choice)
5.0/5
(31)

__________ describes the amounts of individual resources an existing schedule requires during specific time periods.

(Multiple Choice)
4.8/5
(34)

If the crash cost is $1,000,the normal cost is $500,the crash time is 3,and the normal time is 5,what is the slope?

(Multiple Choice)
4.8/5
(33)

Economically speaking,crashing a project creates a technology change in the __________ for an activity.

(Multiple Choice)
4.8/5
(36)

One cannot save __________,rather one can only spend more or less of it.

(Multiple Choice)
4.9/5
(31)

Three important parameters used to assess the effectiveness of a scheduling system include schedule slippage,in-process inventory,and __________.

(Multiple Choice)
4.9/5
(31)

__________ times result from an attempt to expedite the activity by the application of additional resources.

(Multiple Choice)
4.9/5
(35)

Discuss some other causes of the strong optimistic bias in a project schedule.

(Essay)
5.0/5
(32)

Using the __________ heuristic method,the project team should be able to complete the maximum number of tasks during a given period of time.

(Multiple Choice)
4.8/5
(32)

The __________ technique overlaps the design and build phases of a project to expedite its completion.

(Multiple Choice)
4.9/5
(33)

Studies have shown that the __________ scheduling heuristic method usually results in the minimum amount of project schedule slippage,best utilization of facilities,and minimum total system occupancy time.

(Multiple Choice)
4.8/5
(34)

The __________ approach to constrained resource scheduling problems is the only feasible method of attacking large,nonlinear,complex problems that tend to occur in the real world of project management.

(Multiple Choice)
4.9/5
(41)

When we change technology,we may also be changing the level of __________ in carrying out the activity.

(Multiple Choice)
4.9/5
(36)

The methods to find an optimal solution to the constrained resource scheduling problem fall into two categories.They are __________.

(Multiple Choice)
4.9/5
(30)

The two principles to follow when crashing a project focuses on the __________.

(Multiple Choice)
4.8/5
(28)

In CPM,__________ are specified.

(Multiple Choice)
4.8/5
(30)

Fast-tracking is a partial use of the basic concept in ______ project management and is dependent on effective feedback and feedforward communication.

(Multiple Choice)
4.9/5
(30)