Exam 5: Scope Management

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

What is the purpose of controls? Describe any three types of control systems.

Free
(Essay)
4.8/5
(37)
Correct Answer:
Verified

Control systems are vital to ensure that any changes to the project baseline are conducted in a systematic and thorough manner.The focus of a control system may be on configuration,design,trends,documents,acquisition,or specification.
Configuration control takes procedures that monitor emerging project scope against original baseline scope.Design control relates to systems for monitoring the project's scope,schedule,and costs during the design stage.Trend monitoring is the process of tracking the estimated costs,schedules,and resources needed against those planned.Document control ensures that important documentation is compiled and disseminated in an orderly and timely fashion.Acquisition control monitors systems used to acquire necessary project equipment,materials,or services needed for project development and implementation.Specification control ensures that project specifications are prepared clearly,communicated to all concerned parties,and changed only with proper authorization.

Provide an example of one sustainable project management practice that organizations with a commitment to sustainability may implement.

Free
(Essay)
5.0/5
(36)
Correct Answer:
Verified

Examples may vary,but project management practices may include the following sustainability initiatives:
1)Engaging in sustainable projects or projects that will not cause harm to the planet or its inhabitants.
2)Employing sustainable practices while undertaking the projects themselves.
3)Developing sustainable supplier practices.
4)Emphasizing sustainability in project design.

The ambitious sprinkler system project was finally over and it was hard to believe that it took only two years.The project manager leaned back in his office chair and admired his emerald green lawn and flower garden that was filling in nicely.He was amused by the birds that had gathered to bathe and drink at a persistent puddle just outside his window,a harbinger of the first major repair of his own shoddy workmanship.His review of receipts for the job was less entertaining;between trips to the local home improvement store,consultations with plumbers,city inspectors,and some hired labor,he had sunk a small fortune into his lawn.The manager's:

Free
(Multiple Choice)
4.7/5
(26)
Correct Answer:
Verified

C

Expected commitments from other departments in support of the project would most likely be detailed in the:

(Multiple Choice)
4.9/5
(34)

Which statement about conceptual development is BEST?

(Multiple Choice)
4.8/5
(39)

The status accounting step of configuration management functions primarily as:

(Multiple Choice)
4.8/5
(35)

Scope management for a project begins with:

(Multiple Choice)
4.9/5
(43)

Procedures that monitor emerging project scope against the original baseline scope are called:

(Multiple Choice)
4.8/5
(33)

Implementing sustainable practices in projects will require organizations to pay attention to:

(Multiple Choice)
4.9/5
(39)

The primary action during a configuration review is to:

(Multiple Choice)
4.9/5
(40)

Rank the key steps in information development from most to least important and justify your rankings.

(Essay)
4.8/5
(36)

What is the difference between a turnkey contract and a cost-plus contract? Include in your discussion the advantages and disadvantages of each.

(Essay)
5.0/5
(41)

The BEST time to establish reasonable controls is:

(Multiple Choice)
4.8/5
(44)

Budget and schedule information for each activity in a project is contained in the:

(Multiple Choice)
4.8/5
(34)

Closeout documentation that follows a formal reporting structure,including analysis and documentation of the project's performance in terms of cost,schedule adherence,and technical specification performance,is:

(Multiple Choice)
4.8/5
(37)

The project closeout step requires project managers to consider the types of records and reports they and their clients will require at the completion of a project.

(True/False)
5.0/5
(40)

Sustainable project management first assumes that the types of projects being undertaken are intended to benefit others socially,environmental,and economically.

(True/False)
4.9/5
(40)

The cat-skinning project management team considers the many ways to accomplish their objective before settling on one technique as part of their:

(Multiple Choice)
4.8/5
(28)

Considering if project staff are being managed in a fair way is an example of a social sustainability consideration during the execution stage of the project life cycle.

(True/False)
4.8/5
(37)

The PMBoK definition stating,"a hierarchical decomposition of the total scope of work to be carried out by the project team to accomplish the project objectives and create the project deliverables," is for the:

(Multiple Choice)
4.8/5
(32)
Showing 1 - 20 of 111
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)