Exam 17: Acquiring and Implementing Accounting Information Systems

arrow
  • Select Tags
search iconSearch Question
flashcardsStudy Flashcards
  • Select Tags

Which of the following statements regarding software acquisition (purchase vs. in-house development) is false?

(Multiple Choice)
4.8/5
(39)

The goal of validating vendor proposals is to determine:

(Multiple Choice)
4.9/5
(43)

A(n) ______________________________ is a document sent to vendors that invite submission of plans for providing hardware, software, and services.

(Short Answer)
4.8/5
(35)

A problem has an economically feasible solution if it can be solved with existing software and hardware technology.

(True/False)
5.0/5
(41)

The following is a jumbled list of the four steps in structured systems analysis that were presented in the text: I. Define the future lopical system.\text {Define the future lopical system.} II. Dacument the current lopical system\text {Dacument the current lopical system} III. Study the current physical system.\text {Study the current physical system.} IV. Design the future physical system.\text {Design the future physical system.} Which of the following is the logically correct sequence of steps?

(Multiple Choice)
4.9/5
(36)

The cost/benefit study attempts to answer the questions, "which alternative accomplishes the user's goals for the least cost (or greatest benefit)?" and "which alternative best accomplishes a user's goals for the system being developed?"

(True/False)
4.7/5
(36)

Interviews that are conducted with personnel outside the organization are called ______________________________.

(Short Answer)
5.0/5
(39)

A benchmark is a representative workload, processed on each vendor's proposed system configuration, to obtain comparative throughput measures.

(True/False)
4.8/5
(34)

A(n) ______________________________ is a firm providing information processing services, including hardware and software for a fee.

(Short Answer)
4.8/5
(34)

In which role might the accountant be the person who initiates the AIS acquisition cycle, and is in a prime position to recognize deficiencies and incompatibilities related to the existing AIS?

(Multiple Choice)
4.8/5
(33)

The analysis team conducts a cost/effectiveness study, which provides quantitative and certain qualitative information concerning each of the system alternatives.

(True/False)
4.7/5
(36)

To write computer programs and interfaces, programmers use:

(Multiple Choice)
4.8/5
(40)

The physical requirements of a proposed system would include all of the following except:

(Multiple Choice)
4.9/5
(34)

If the payback and internal rate of return estimates are sufficient to allow the development project to proceed it is said to have ______________________________ feasibility.

(Short Answer)
4.7/5
(32)

The direct approach is also known as the ______________________________ or ______________________________ approach.

(Short Answer)
4.9/5
(44)

Which of the following is conducted as a follow up to a system's recent implementation?

(Multiple Choice)
4.9/5
(38)

Systems design is a set of procedures performed to choose the software specifications and hardware resources for an information system.

(True/False)
4.7/5
(32)

Which of the following has the task of evaluating alternative AIS solutions?

(Multiple Choice)
4.9/5
(32)

Tasks of the ______________________________ phase are to conduct post-implementation review and to perform systems maintenance.

(Short Answer)
4.7/5
(38)

Typically, all of the following are tasks of structured systems design except:

(Multiple Choice)
4.8/5
(37)
Showing 21 - 40 of 206
close modal

Filters

  • Essay(0)
  • Multiple Choice(0)
  • Short Answer(0)
  • True False(0)
  • Matching(0)